# DEWA, 250 MW Hatta Pompalı Hidroelektrik Santralinde Nihai Devreye Alma Testlerini Tamamladı

> Dubai Elektrik ve Su İdaresi (DEWA), 132 kV şebekesine senkronizasyonun ardından 250 MW Hatta pompalı hidroelektrik santralinde %99 tamamlanma oranına ulaştı.

- **Kaynak tarihi:** 2026-10-01
- **Orijinal kaynak:** [Dubai Electricity and Water Authority Press Release](https://www.dewa.gov.ae/en/about-us/media-publications/latest-news/2026/10/hatta-pumped-storage-tests)
- **Okuma süresi:** 1 min
- **Language:** tr
- **URL:** https://voltformer.com/tr/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026
- **Markdown:** https://voltformer.com/tr/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026.md
- **Keywords:** UAE, DEWA, Pompalı hidroelektrik depolama, Hidroelektrik, Enerji Depolama, Dubai

## Hidro Türbin Hızlı Tepki Yeteneği

Santral, 132 kV şebekesini beslemek için 90 saniye içinde 250 MW tam üretim kapasitesine çıkabilen 2 tersinir pompa-türbin kullanmaktadır.

Hızlı devreye girme yeteneği, çöl güneş santrallerinden gelen kesintili üretimi desteklemek için acil durum yedeklemesi ve dönen rezerv sunmaktadır.

## Depolama Kapasitesi ve Dağ Rezervuarı Entegrasyonu

Tesis, otomatik kapak kontrollerine sahip 2 rezervuar arasında su devridaimi sağlayarak 1500 MWh depolama kapasitesi sunmaktadır.

Gelişmiş yeraltı cebri boru izleme sistemleri, yapısal güvenliği ve optimum hidrolik sevk verimliliğini garanti etmektedir.

## Diğer diller

- [en](https://voltformer.com/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [tr](https://voltformer.com/tr/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [de](https://voltformer.com/de/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [ru](https://voltformer.com/ru/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [es](https://voltformer.com/es/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [ar](https://voltformer.com/ar/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [it](https://voltformer.com/it/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)
- [pt](https://voltformer.com/pt/news/dewa-completes-99-percent-hatta-pumped-storage-hydro-tests-october-2026)

[Şirket ve enerji haberleri](https://voltformer.com/tr/news.md) · [Voltformer kataloğu](https://voltformer.com/tr/catalog)
