# DEWA, Muhammed bin Raşid Güneş Parkı Aşama 6 İçin 400 kV Trafo Merkezini Hizmete Aldı

> Dubai Elektrik ve Su İdaresi (DEWA), Muhammed bin Raşid El Maktum Güneş Parkı'nda 6. Aşamadan 1800 MW güneş gücünü tahliye etmek için 400 kV iletim trafo merkezini devreye aldı.

- **Kaynak tarihi:** 2026-10-04
- **Orijinal kaynak:** [Dubai Electricity and Water Authority Media Centre](https://www.dewa.gov.ae/en/about-us/media-publications/latest-news/2026/10/mbr-solar-park-phase-6-substation)
- **Okuma süresi:** 1 min
- **Language:** tr
- **URL:** https://voltformer.com/tr/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026
- **Markdown:** https://voltformer.com/tr/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026.md
- **Keywords:** UAE, DEWA, Trafo merkezi, 400 kV, Güneş Enerjisi, Dubai

## İleri Dijital Trafo Merkezi Mimarisi

Trafo merkezi 400 kV ve 132 kV gerilim seviyelerinde çalışmakta olup dijital proses veri yolu haberleşmesini kullanan 4 oto-transformatörü birbirine bağlamaktadır.

Gelişmiş fiber optik röle şebekeleri, tüm çıkış fider hücrelerinde periyot altı diferansiyel koruma ve anlık arıza izolasyonu sunmaktadır.

## Temiz Enerji Şebeke Hedeflerini Destekleme

Trafo merkezi, merkezi iletim koridorlarında %100 dijital koruma yedekliliği sağlayarak Dubai Temiz Enerji Stratejisini desteklemektedir.

Yüksek kapasiteli güç transformatörleri, verimli gerilim yükseltme ve emirlik ana besleme şebekesine kararlı elektrik aktarımı sağlamaktadır.

## Diğer diller

- [en](https://voltformer.com/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [tr](https://voltformer.com/tr/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [de](https://voltformer.com/de/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [ru](https://voltformer.com/ru/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [es](https://voltformer.com/es/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [ar](https://voltformer.com/ar/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [it](https://voltformer.com/it/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [pt](https://voltformer.com/pt/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)

[Şirket ve enerji haberleri](https://voltformer.com/tr/news.md) · [Voltformer kataloğu](https://voltformer.com/tr/catalog)
