{
  "language": "en",
  "interfaceLanguage": "pt",
  "url": "https://voltformer.com/pt/news/uhde-posco-low-emission-coke-oven-2026",
  "slug": "uhde-posco-low-emission-coke-oven-2026",
  "category": "epc-contractors",
  "publishDate": "2026-04-02",
  "sourceName": "thyssenkrupp Uhde",
  "sourceUrl": "https://www.thyssenkrupp-uhde.com/en/media/press-releases/press-detail/thyssenkrupp-uhde-awarded-with-contract-for-low-emission-coke-oven-battery-in-south-korea-312751",
  "readingTimeMinutes": 1,
  "tags": [
    "thyssenkrupp Uhde"
  ],
  "content": {
    "title": "Uhde wins low-emission coke-oven battery contract in South Korea",
    "summary": "POSCO selected Uhde technology, engineering support and lower-emission by-product treatment systems for a new coke-oven battery in South Korea.",
    "tags": [
      "thyssenkrupp Uhde"
    ],
    "sections": [
      {
        "heading": "Scope of the official announcement",
        "paragraphs": [
          "POSCO selected Uhde technology, engineering support and lower-emission by-product treatment systems for a new coke-oven battery in South Korea."
        ],
        "sources": [
          {
            "name": "thyssenkrupp Uhde",
            "url": "https://www.thyssenkrupp-uhde.com/en/media/press-releases/press-detail/thyssenkrupp-uhde-awarded-with-contract-for-low-emission-coke-oven-battery-in-south-korea-312751"
          }
        ]
      },
      {
        "heading": "Voltformer analysis",
        "paragraphs": [
          "Uhde’s portfolio spans licensing, early engineering, plant integration, EPC and brownfield revamps. Naming the project stage in each announcement distinguishes pre-investment engineering from a final project decision, a new build from a retrofit, and a production target from current output."
        ]
      },
      {
        "heading": "Considerations for project teams",
        "paragraphs": [
          "Chemical-plant projects can divide process licensing, basic and detailed engineering, equipment supply, construction and commissioning into separate work packages. A contractor’s name in a project announcement does not mean it holds every responsibility. Interfaces among the client, technology providers and site contractors shape both schedule and performance outcomes."
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "thyssenkrupp-uhde",
      "name": "thyssenkrupp Uhde",
      "href": "/pt/epc-contractors/thyssenkrupp-uhde",
      "website": "https://www.thyssenkrupp-uhde.com/en",
      "aliases": [
        "thyssenkrupp Uhde",
        "تيسين كروب أوده",
        "Uhde",
        "thyssenkrupp"
      ]
    }
  ]
}
