# NextEra Energy comissiona subestação de 345 kV para 1000 MW eólicos e baterias em Iowa

> A NextEra Energy Resources comissionou uma subestação de 345 kV com 2 transformadores elevadores de 550 MVA para injetar 1000 MW de energia híbrida no mercado MISO.

- **Data da fonte:** 2026-10-01
- **Fonte original:** [NextEra Energy Media Relations](https://www.nexteraenergy.com/newsroom/iowa-345kv-switching-station-wind-storage-october-2026)
- **Tempo de leitura:** 1 min
- **Language:** pt
- **URL:** https://voltformer.com/pt/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026
- **Markdown:** https://voltformer.com/pt/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026.md
- **Keywords:** USA, NextEra Energy, MISO, 345kV, BESS, Energia eólica

## Interligação do complexo renovável híbrido

A nova subestação de 345 kV integra um parque eólico de 800 MW e um sistema BESS de 200 MW / 800 MWh em um único nó de transmissão.

2 transformadores elevadores de 550 MVA elevam a tensão de 34.5 kV para 345 kV para transporte a longa distância.

## Interconexão MISO e regulação de tensão

Controladores coordenam a potência reativa entre os inversores e as baterias, mantendo o fator de potência estável em 0.95.

O empreendimento injeta até 1000 MW de eletricidade limpa nos corredores regionais, reduzindo a dependência de combustíveis fósseis.

## Outros idiomas

- [en](https://voltformer.com/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [tr](https://voltformer.com/tr/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [de](https://voltformer.com/de/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [ru](https://voltformer.com/ru/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [es](https://voltformer.com/es/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [ar](https://voltformer.com/ar/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [it](https://voltformer.com/it/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)
- [pt](https://voltformer.com/pt/news/nextera-commissions-345kv-switching-station-iowa-wind-storage-october-2026)

[Notícias da empresa e do setor de energia](https://voltformer.com/pt/news.md) · [Catálogo Voltformer](https://voltformer.com/pt/catalog)
