# Parque eólico de Katsina continua parado após duas décadas de planos alterados

> Uma investigação do Premium Times acompanha os atrasos do projeto eólico Lambar-Rimi de 10 MW, iniciado em 2005. Katsina planeja adicionar 10 MW solares e iniciar a operação no fim de 2026.

- **Data da fonte:** 2026-10-18
- **Fonte original:** [Premium Times](https://www.premiumtimesng.com/news/headlines/917951-stalled-wind-farm-project-in-katsina-typifies-nigerias-struggle-to-build-renewable-energy-industry.html)
- **Tempo de leitura:** 1 min de leitura
- **Idioma:** Português
- **URL:** https://voltformer.com/pt/news/katsina-lambar-rimi-wind-farm-stalled
- **Markdown:** https://voltformer.com/pt/news/katsina-lambar-rimi-wind-farm-stalled.md
- **Palavras-chave:** Nigéria, Energia renovável, Energia eólica, Katsina, Lambar-Rimi

## Parque eólico de Katsina continua parado após duas décadas de planos alterados

Uma investigação do Premium Times acompanha os atrasos do projeto eólico Lambar-Rimi de 10 MW, iniciado em 2005. Katsina planeja adicionar 10 MW solares e iniciar a operação no fim de 2026.

[Premium Times](https://www.premiumtimesng.com/news/headlines/917951-stalled-wind-farm-project-in-katsina-typifies-nigerias-struggle-to-build-renewable-energy-industry.html)

## Outros idiomas

- [en](https://voltformer.com/news/katsina-lambar-rimi-wind-farm-stalled)
- [tr](https://voltformer.com/tr/news/katsina-lambar-rimi-wind-farm-stalled)
- [de](https://voltformer.com/de/news/katsina-lambar-rimi-wind-farm-stalled)
- [ru](https://voltformer.com/ru/news/katsina-lambar-rimi-wind-farm-stalled)
- [es](https://voltformer.com/es/news/katsina-lambar-rimi-wind-farm-stalled)
- [ar](https://voltformer.com/ar/news/katsina-lambar-rimi-wind-farm-stalled)
- [it](https://voltformer.com/it/news/katsina-lambar-rimi-wind-farm-stalled)
- [pt](https://voltformer.com/pt/news/katsina-lambar-rimi-wind-farm-stalled)

[Notícias da empresa e do setor de energia](https://voltformer.com/pt/news.md) · [Catálogo Voltformer](https://voltformer.com/pt/catalog)
