# Archive: ENPRODE’s Livno wind and pumped-storage partnership

> ENPRODE announced a partnership for wind and pumped-storage hydropower projects in the Livno region of Bosnia and Herzegovina.

- **Data da fonte:** Event date: 2017-10-28
- **Fonte original:** [ENPRODE](https://www.enprode.com/News/News-enprode-livno)
- **Tempo de leitura:** 2 min
- **Language:** en
- **URL:** https://voltformer.com/pt/news/enprode-livno-wind-pumped-storage-partnership
- **Markdown:** https://voltformer.com/pt/news/enprode-livno-wind-pumped-storage-partnership.md

## Announcement details

The partnership combines wind power generation and pumped storage hydropower development in the same region's investment agenda. ENPRODE's official archive also includes the video recording announcing this collaboration.

## Partners and investment location

The statement of the Hercegbosna regional government dated October 30 2017 records that the agreement was signed in Livno on October 28. The parties were Pero Vrdoljak on behalf of IMRES smart greenergy and Yüksel Güler on behalf of ENPRODE. The announcement discussed together the wind project Široka Draga in Kamešnica and research work for hydropower with pumped storage.

[Vlada Hercegbosanske županije · Livno](https://www.vladahbz.com/potpisan-ugovor-o-partnerstvu-za-izgradnju-vjetroparka-na-kamesnici-i-reverzibilne-hidroelektrane/)

## Pumping and turbine capacities

ENPRODE’s water resources page lists a pumping design rating of 1120 MW and a turbine design rating of 762 MW for Široka Draga. The company describes storage and flexible response to peak grid demand. These ratings refer to two different operating modes; they must not be added together as installed generating capacity and do not establish that the facility has entered operation.

[ENPRODE · Water resources](https://www.enprode.com/SERVICES/water-resource-development-engineering)

## Wind project development

General wind services of ENPRODE; It covers site selection, wind measurements, technical and financial feasibility and licensing studies. Evaluation of road, transmission line and substation infrastructure is also included in this process. The official page also describes single line diagram and grid connection preparation. This service framework enables understanding the engineering needs of the production and storage components mentioned together in the announcement.

[ENPRODE · Wind power](https://www.enprode.com/SERVICES/wind-power-plant)

## Perfis de empresas relacionadas

- [ENPRODE](https://voltformer.com/pt/epc-contractors/enprode) · [Markdown](https://voltformer.com/pt/epc-contractors/enprode.md)

## Mídia da fonte original

[Fonte original](https://www.youtube.com/watch?v=8AJRaPkQYDA)

## Outros idiomas

- [en](https://voltformer.com/news/enprode-livno-wind-pumped-storage-partnership)
- [tr](https://voltformer.com/tr/news/enprode-livno-wind-pumped-storage-partnership)
- [de](https://voltformer.com/de/news/enprode-livno-wind-pumped-storage-partnership)
- [ru](https://voltformer.com/ru/news/enprode-livno-wind-pumped-storage-partnership)
- [es](https://voltformer.com/es/news/enprode-livno-wind-pumped-storage-partnership)
- [ar](https://voltformer.com/ar/news/enprode-livno-wind-pumped-storage-partnership)
- [it](https://voltformer.com/it/news/enprode-livno-wind-pumped-storage-partnership)
- [pt](https://voltformer.com/pt/news/enprode-livno-wind-pumped-storage-partnership)

[Notícias da empresa e do setor de energia](https://voltformer.com/pt/news.md) · [Catálogo Voltformer](https://voltformer.com/pt/catalog)
