{
  "language": "en",
  "interfaceLanguage": "pt",
  "url": "https://voltformer.com/pt/news/eiffage-spain-solar-cabra-olivar-2025",
  "slug": "eiffage-spain-solar-cabra-olivar-2025",
  "category": "epc-contractors",
  "publishDate": "2025-04-24",
  "sourceName": "Eiffage Énergie Systèmes",
  "sourceUrl": "https://www.eiffage.com/en/media/news/eiffage-wins-the-contract-worth-a-total-of-134-million-to-build-two-solar-photovoltaic-power-plants-with-300-mwp-in-total-capacity-at-cordoba-in-spain-1",
  "readingTimeMinutes": 1,
  "tags": [
    "Eiffage Énergie Systèmes"
  ],
  "content": {
    "title": "Eiffage wins contracts for 300 MWp of solar plants in Spain",
    "summary": "On 24 April 2025, Eiffage’s Spanish subsidiary won a €134 million turnkey contract for Everwood Capital’s Cabra (250 MWp) and Olivar (50 MWp) plants in Córdoba, including high-voltage connection and maintenance.",
    "sections": [
      {
        "heading": "Announced scope",
        "paragraphs": [
          "On 24 April 2025, Eiffage’s Spanish subsidiary won a €134 million turnkey contract for Everwood Capital’s Cabra (250 MWp) and Olivar (50 MWp) plants in Córdoba, including high-voltage connection and maintenance."
        ],
        "sources": [
          {
            "name": "Eiffage Énergie Systèmes",
            "url": "https://www.eiffage.com/en/media/news/eiffage-wins-the-contract-worth-a-total-of-134-million-to-build-two-solar-photovoltaic-power-plants-with-300-mwp-in-total-capacity-at-cordoba-in-spain-1"
          }
        ]
      },
      {
        "heading": "Contract boundary",
        "paragraphs": [
          "Eiffage Énergie Systèmes delivers electrical, automation and energy infrastructure packages. It may lead a group consortium or act through a JV or subcontract; client, technology-supplier and long-term operator roles are distinct."
        ]
      },
      {
        "heading": "Project follow-through",
        "paragraphs": [
          "Connection capacity, generation, battery power and storage duration are different measures. Final acceptance, permits and commercial-operation dates should be verified separately from targets."
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "eiffage-energie-systemes",
      "name": "Eiffage Énergie Systèmes",
      "href": "/pt/epc-contractors/eiffage-energie-systemes",
      "website": "https://www.eiffageenergiesystemes.com/",
      "aliases": [
        "Eiffage Énergie Systèmes",
        "إيفاج لأنظمة الطاقة",
        "Eiffage Energie Systemes",
        "Eiffage Energy Systems"
      ]
    }
  ]
}
