# DEWA comissiona subestação de 400 kV para conectar a fase 6 do parque solar Mohammed bin Rashid

> A Autoridade de Eletricidade e Água de Dubai (DEWA) comissionou uma subestação de transmissão de 400 kV no Parque Solar Mohammed bin Rashid Al Maktoum para escoar 1800 MW de energia solar da fase 6.

- **Data da fonte:** 2026-10-04
- **Fonte original:** [Dubai Electricity and Water Authority Media Centre](https://www.dewa.gov.ae/en/about-us/media-publications/latest-news/2026/10/mbr-solar-park-phase-6-substation)
- **Tempo de leitura:** 1 min
- **Language:** pt
- **URL:** https://voltformer.com/pt/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026
- **Markdown:** https://voltformer.com/pt/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026.md
- **Keywords:** UAE, DEWA, Subestação, 400 kV, Energia Solar, Dubai

## Arquitetura avançada de subestação digital

A subestação opera nos níveis de tensão de 400 kV e 132 kV e conecta 4 autotransformadores utilizando comunicação digital por barramento de processo.

Redes de relés por fibra óptica fornecem proteção diferencial subcíclica e isolamento instantâneo de faltas em todas as saídas de alimentadores.

## Apoio às metas de energia limpa

A subestação apoia a Estratégia de Energia Limpa de Dubai com 100% de redundância digital de proteção nos corredores centrais da rede elétrica.

Transformadores de potência de grande porte garantem elevação eficiente de tensão e despacho estável para a rede principal de transmissão do emirado.

## Outros idiomas

- [en](https://voltformer.com/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [tr](https://voltformer.com/tr/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [de](https://voltformer.com/de/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [ru](https://voltformer.com/ru/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [es](https://voltformer.com/es/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [ar](https://voltformer.com/ar/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [it](https://voltformer.com/it/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [pt](https://voltformer.com/pt/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)

[Notícias da empresa e do setor de energia](https://voltformer.com/pt/news.md) · [Catálogo Voltformer](https://voltformer.com/pt/catalog)
