{
  "language": "pt",
  "url": "https://voltformer.com/pt/epc-contractors/enersense",
  "company": {
    "id": "enersense",
    "slug": "enersense",
    "name": "Enersense International Oyj",
    "legalName": "Enersense International Oyj",
    "country": "Finland",
    "countryCode": "FI",
    "headquarters": "Pori, Finland",
    "foundedYear": 2005,
    "website": "https://enersense.com",
    "logo": "/logos/enersense.svg",
    "tagline": "Turnkey high-voltage substations, grid connections and battery storage infrastructure",
    "overview": "Enersense International Oyj is a Finnish lifecycle partner for energy transmission and generation, industrial energy transition, telecommunications and data centres. Its Power business designs, builds, commissions, maintains and modernises high-voltage infrastructure. Enersense explicitly offers turnkey EPC deliveries for 110 kV and 400 kV substations, including engineering, civil works, installation, testing and commissioning; it also delivers turnkey BESS solutions and grid connections. Procurement of long-lead items and GIS system interfaces may be agreed case by case, so final scope remains contract-specific.",
    "specialization": [
      "110 kV and 400 kV turnkey substations (AIS and GIS)",
      "High-voltage transmission and grid interconnections",
      "Turnkey battery energy storage system (BESS) delivery",
      "Substation and grid asset maintenance, upgrades and lifecycle services"
    ],
    "sectors": [
      "substations-transmission",
      "renewable-energy",
      "energy-storage-bess",
      "power-generation"
    ],
    "services": [
      {
        "name": "Turnkey substations",
        "description": "Primary and secondary engineering, civil works, equipment installation, testing, commissioning and documentation for 110 kV and 400 kV substations; selected long-lead procurement and GIS interfaces are agreed case by case."
      },
      {
        "name": "BESS and grid integration",
        "description": "Turnkey battery storage delivery combining engineering, substation integration, site and civil work, electrical installation, grid connection, commissioning and lifecycle services."
      },
      {
        "name": "High-voltage lines and connections",
        "description": "110 kV and 400 kV overhead-line or underground-cable connections, from route design and permitting through construction, testing and commissioning."
      },
      {
        "name": "Lifecycle operations and maintenance",
        "description": "Preventive and corrective maintenance, modernisation, remote monitoring, control-room operations and fault response for substations, BESS and grid assets."
      }
    ],
    "turnkeyCapabilities": {
      "engineeringDesign": true,
      "procurementSupply": true,
      "constructionCivil": true,
      "commissioningTesting": true,
      "substationEpc": true,
      "highVoltageTransmission": true,
      "powerPlantEpc": false,
      "gridInterconnection": true
    },
    "keyProjects": [
      {
        "title": "Liepaja ESS battery storage park",
        "sourceUrl": "https://enersense.com/releases/enersense-to-deliver-its-first-full-scope-battery-energy-storage-park-in-latvia/",
        "client": "Liepaja ESS",
        "country": "Latvia",
        "capacityOrScope": "Full-scope BESS park plus 110 kV grid connection and 110/33 kV transformer; approx. €7 million contract",
        "completionYear": "2026 (scheduled)",
        "description": "Enersense received its first full-scope BESS park contract, covering site preparation, civil and electrical work, equipment installation, control building and final grid connection through a new 110 kV cable line. The February 2026 release scheduled completion during 2026; the award is a construction-and-installation delivery, not described as a battery-cell supply contract.",
        "technologies": [
          "BESS",
          "110 kV grid connection",
          "110/33 kV transformer"
        ]
      },
      {
        "title": "Kannisto wind farm BESS and turnkey substation",
        "sourceUrl": "https://enersense.com/releases/enersense-wins-its-first-large-scale-battery-energy-storage-project-in-finland/",
        "client": "OX2",
        "country": "Finland",
        "capacityOrScope": "125 MW / 250 MWh BESS; turnkey substation extension and approx. 1 km medium-voltage cable",
        "completionYear": "Wind farm scheduled for commissioning in 2028",
        "description": "Enersense was contracted for the full BESS delivery from site preparation through installation and grid connection, as well as the previously agreed turnkey substation extension. Its scope includes earthworks, foundations, installation, transformer bay, medium-voltage switchgear and about one kilometre of cabling; OX2 is developing the wind farm.",
        "technologies": [
          "BESS",
          "125 MW / 250 MWh",
          "Substation and grid connection"
        ]
      },
      {
        "title": "Herva 400/110 kV substation",
        "sourceUrl": "https://enersense.com/releases/enersense-will-build-a-new-substation-in-herva-ii/",
        "client": "Fingrid",
        "country": "Finland",
        "capacityOrScope": "Main contractor for a 400/110 kV transformer substation and connected Herva–Nuojuankangas line; approx. €15 million contract",
        "completionYear": "Scheduled through 2027",
        "description": "Enersense was selected as main contractor to build Fingrid’s Herva 400/110 kV substation in Ii, as part of a larger contract package, and is also constructing the connecting Herva–Nuojuankangas line. The disclosed contract value is approximately €15 million, with work expected to continue through 2027.",
        "technologies": [
          "400/110 kV substation",
          "High-voltage transmission",
          "Wind-farm grid connection"
        ]
      }
    ],
    "certifications": [],
    "highlightStats": [
      {
        "label": "Revenue (2025)",
        "value": "€307 million"
      },
      {
        "label": "Employees (company profile)",
        "value": "1,500"
      },
      {
        "label": "Founded",
        "value": "2005"
      },
      {
        "label": "Head office",
        "value": "Pori, Finland"
      }
    ],
    "contactInfo": {
      "address": "Konepajanranta 2, FI-28100 Pori, Finland",
      "phone": "+358 29 020 011",
      "website": "https://enersense.com",
      "inquiryUrl": "https://enersense.com/contact-us/"
    }
  },
  "leadership": {
    "name": "Kari Sundbäck",
    "since": "2024-09-23",
    "role": {
      "tr": "CEO",
      "en": "Chief Executive Officer",
      "pt": "Diretor executivo",
      "de": "Chief Executive Officer",
      "ru": "Генеральный директор",
      "es": "Director ejecutivo",
      "ar": "الرئيس التنفيذي",
      "it": "Amministratore delegato"
    },
    "biography": {
      "tr": "23 Eylül 2024’ten beri Enersense International Oyj CEO’sudur. 1971 doğumlu, mühendislik yüksek lisansına sahiptir. Daha önce Caverion’da Hizmetler, Çözümler, Dijitalleşme ve Sürdürülebilirlikten sorumlu başkan yardımcısı; KONE ve Nokia’da yönetici görevlerinde bulundu.",
      "en": "Chief Executive Officer of Enersense International Oyj since 23 September 2024. Born in 1971, he holds an MSc in Engineering. He previously served as Caverion’s Executive Vice President for Services, Solutions, Digital and Sustainability, and held leadership roles at KONE and Nokia.",
      "pt": "É CEO da Enersense International Oyj desde 23 de setembro de 2024. Nascido em 1971, possui mestrado em Engenharia. Anteriormente, foi vice-presidente executivo de Serviços, Soluções, Digitalização e Sustentabilidade da Caverion e ocupou cargos de liderança na KONE e na Nokia.",
      "de": "Seit dem 23. September 2024 Chief Executive Officer von Enersense International Oyj. Jahrgang 1971, MSc in Engineering. Zuvor war er Executive Vice President für Services, Solutions, Digital und Sustainability bei Caverion und hatte Führungspositionen bei KONE und Nokia inne.",
      "ru": "С 23 сентября 2024 года — генеральный директор Enersense International Oyj. Родился в 1971 году, имеет степень магистра инженерных наук. Ранее был исполнительным вице-президентом по услугам, решениям, цифровизации и устойчивому развитию в Caverion, занимал руководящие должности в KONE и Nokia.",
      "es": "Director ejecutivo de Enersense International Oyj desde el 23 de septiembre de 2024. Nacido en 1971, tiene un máster en Ingeniería. Antes fue vicepresidente ejecutivo de Servicios, Soluciones, Digitalización y Sostenibilidad en Caverion y ocupó cargos directivos en KONE y Nokia.",
      "ar": "يشغل منصب الرئيس التنفيذي لشركة Enersense International Oyj منذ 23 سبتمبر 2024. وُلد عام 1971 ويحمل درجة الماجستير في الهندسة. شغل سابقًا منصب نائب الرئيس التنفيذي للخدمات والحلول والرقمنة والاستدامة في Caverion، وتولى مناصب قيادية في KONE وNokia.",
      "it": "È amministratore delegato di Enersense International Oyj dal 23 settembre 2024. Nato nel 1971, ha conseguito un MSc in ingegneria. In precedenza è stato Executive Vice President per servizi, soluzioni, digitale e sostenibilità in Caverion e ha ricoperto ruoli dirigenziali in KONE e Nokia."
    },
    "sources": [
      {
        "name": "Enersense · Group Leadership Team",
        "url": "https://enersense.com/executive-management/"
      }
    ],
    "verifiedOn": "2026-10-04"
  },
  "news": [
    {
      "title": "Enersense selected to maintain 18 Fingrid substations in Lapland",
      "url": "https://voltformer.com/pt/news/enersense-fingrid-lapland-substation-maintenance-2026"
    },
    {
      "title": "Enersense to build a 330/110 kV transmission line in Estonia",
      "url": "https://voltformer.com/pt/news/enersense-paide-sindi-330-110kv-line-2026"
    },
    {
      "title": "Enersense to deliver high-voltage substation integration for atNorth",
      "url": "https://voltformer.com/pt/news/enersense-atnorth-kouvola-substation-2026"
    },
    {
      "title": "Enersense to maintain and develop Elektrilevi’s Estonian network",
      "url": "https://voltformer.com/pt/news/enersense-elektrilevi-estonia-framework-2026"
    },
    {
      "title": "Enersense wins full delivery of a 125 MW / 250 MWh Kannisto battery",
      "url": "https://voltformer.com/pt/news/enersense-kannisto-bess-full-delivery-2026"
    },
    {
      "title": "Enersense to deliver Fingrid’s Nokia substation turnkey",
      "url": "https://voltformer.com/pt/news/enersense-nokia-400-110kv-turnkey-substation-2025"
    },
    {
      "title": "Enersense to build a 110 kV underground cable line in Tartu",
      "url": "https://voltformer.com/pt/news/enersense-tartu-underground-110kv-cable-2025"
    }
  ]
}
