{
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/techint-duplicar-norte-capacity-expansion-2026",
  "slug": "techint-duplicar-norte-capacity-expansion-2026",
  "category": "epc-contractors",
  "publishDate": "2026-08-03",
  "sourceName": "Techint Engineering & Construction",
  "sourceUrl": "https://www.techint.com/en/news/2026/duplicar-norte-the-infrastructure-that-will-expand-crude-oil-transportation-capacity-from-vaca-muerta",
  "readingTimeMinutes": 1,
  "tags": [
    "Techint Engineering & Construction",
    "EPC"
  ],
  "content": {
    "title": "Techint details the Duplicar Norte EPC transport corridor",
    "summary": "Techint described Oldelval’s 207 km Duplicar Norte EPC pipeline between Auca Mahuida and Allen. The project is designed to connect with Oldelval’s trunk system and the VMOS corridor, expanding crude-oil transport infrastructure.",
    "sections": [
      {
        "heading": "Reported project milestone",
        "paragraphs": [
          "Techint described Oldelval’s 207 km Duplicar Norte EPC pipeline between Auca Mahuida and Allen. The project is designed to connect with Oldelval’s trunk system and the VMOS corridor, expanding crude-oil transport infrastructure.",
          "A network expansion needs coordinated hydraulic design and operating boundaries, not merely additional pipe length. Engineering comparisons should check pumping duties, interconnection conditions and the staged start-up plan. Design capacity should be distinguished from throughput already achieved, especially where upstream production and downstream export facilities enter service on different schedules."
        ],
        "sources": [
          {
            "name": "Techint Engineering & Construction",
            "url": "https://www.techint.com/en/news/2026/duplicar-norte-the-infrastructure-that-will-expand-crude-oil-transportation-capacity-from-vaca-muerta"
          }
        ]
      },
      {
        "heading": "Engineering and delivery perspective",
        "paragraphs": [
          "For procurement and project comparisons, distinguish the contracted package from the wider development. A physical construction milestone is evidence of progress, while acceptance, permits and sustained operation require their own confirmation. Review the interfaces with the owner, equipment suppliers and other contractors, including the testing responsibility, operating documentation, handover conditions and treatment of outstanding work."
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "techint-engineering",
      "name": "Techint Engineering & Construction",
      "href": "/epc-contractors/techint-engineering",
      "website": "https://www.techint.com/en",
      "aliases": [
        "Techint Engineering & Construction",
        "تيكينت للهندسة والإنشاءات",
        "Techint E&C",
        "Techint"
      ]
    }
  ]
}
