{
  "schemaVersion": 1,
  "contentDigest": "617082eb310674026fecd0287cfdf7ddc27cfad7f725b08ac0c28017e6fb6778",
  "id": "news-oct22-continued-sy-deir-ezzor-mayadin-bridge-rebuild-starts-20261001",
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/sy-deir-ezzor-mayadin-bridge-rebuild-starts-20261001",
  "slug": "sy-deir-ezzor-mayadin-bridge-rebuild-starts-20261001",
  "category": "policy-standards",
  "publishDate": "2026-10-01",
  "sourceName": "Syrian Arab News Agency (SANA)",
  "sourceUrl": "https://sana.sy/locals/2594799/",
  "readingTimeMinutes": 1,
  "tags": [
    "Transport",
    "Infrastructure",
    "Deir Ezzor",
    "Syria"
  ],
  "content": {
    "title": "Reconstruction begins on Deir Ezzor’s Mayadin bridge",
    "summary": "Works are planned to take 9 months; the bridge has been out of service for about a decade",
    "sections": [
      {
        "paragraphs": [
          "Deir Ezzor Governorate announced that construction had begun to rebuild the Mayadin bridge across the Euphrates. Governor Ziad al-Ayesh said the Syrian Construction and Development Corporation and Turkish road-construction company al-Barq would carry out the work over 9 months. The governorate said the bridge had been out of service for about a decade and was an important connection for movement and trade between the river’s two banks. Reopening was not reported."
        ],
        "sources": [
          {
            "name": "Syrian Arab News Agency (SANA)",
            "url": "https://sana.sy/locals/2594799/"
          }
        ]
      }
    ]
  },
  "companies": [],
  "sourceVersion": "a0df7e98ce85a4d7c4a0c5b49a9195be5b904131ba40bd253577750d57c1446b"
}
