# Paving starts on Idlib’s Darkush–Salqin road after more than 20 years

> Crews began replacing the road surface, with a 6-centimetre asphalt layer and markings still to follow.

- **Source date:** 2026-10-21
- **Original source:** [Syrian Arab News Agency (SANA)](https://sana.sy/governorates/edlib/2613435/)
- **Reading time:** 1 min read
- **Language:** English
- **URL:** https://voltformer.com/news/sy-darkush-salqin-road-paving-20261021
- **Markdown:** https://voltformer.com/news/sy-darkush-salqin-road-paving-20261021.md

Public construction crews in Idlib began asphalt work on the Darkush–Salqin road after more than 20 years since its last maintenance, according to SANA. The work includes removing old asphalt and laying a new 6-centimetre layer; road markings are planned after paving is complete. The route serves western Idlib and links the Harim area with Jisr al-Shughur and the M4 corridor toward Syria’s coast.

[Syrian Arab News Agency (SANA)](https://sana.sy/governorates/edlib/2613435/)

## Other languages

- [en](https://voltformer.com/news/sy-darkush-salqin-road-paving-20261021)
- [tr](https://voltformer.com/tr/news/sy-darkush-salqin-road-paving-20261021)
- [de](https://voltformer.com/de/news/sy-darkush-salqin-road-paving-20261021)
- [ru](https://voltformer.com/ru/news/sy-darkush-salqin-road-paving-20261021)
- [es](https://voltformer.com/es/news/sy-darkush-salqin-road-paving-20261021)
- [ar](https://voltformer.com/ar/news/sy-darkush-salqin-road-paving-20261021)
- [it](https://voltformer.com/it/news/sy-darkush-salqin-road-paving-20261021)
- [pt](https://voltformer.com/pt/news/sy-darkush-salqin-road-paving-20261021)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
