# Stantec joins the Pure Water Los Angeles engineering program

> The Los Angeles Bureau of Sanitation selected Stantec for Pure Water Los Angeles. With Carollo Engineers, the firm provides program-management support and conceptual design for converting Hyperion from secondary treatment to advanced water treatment (AWT). It also supports operations, maintenance and regulatory work for the Hyperion membrane-bioreactor (MBR) pilot. The city’s goal is up to 230 million gallons/day of purified recycled water and a 70% locally sourced water supply, compared with approximately 50% at the announcement. These are program targets and a reported baseline, not completed production or a full-plant EPC award.

- **Source date:** 2026-07-28
- **Original source:** [Stantec](https://www.stantec.com/en/news/2026/stantec-selected-los-angeles-bureau-sanitation-key-partner-advance-water-reuse)
- **Reading time:** 2 min
- **Language:** en
- **URL:** https://voltformer.com/news/stantec-pure-water-los-angeles-conceptual-design-2026
- **Markdown:** https://voltformer.com/news/stantec-pure-water-los-angeles-conceptual-design-2026.md

## Official announcement and scope

The Los Angeles Bureau of Sanitation selected Stantec for Pure Water Los Angeles. With Carollo Engineers, the firm provides program-management support and conceptual design for converting Hyperion from secondary treatment to advanced water treatment (AWT). It also supports operations, maintenance and regulatory work for the Hyperion membrane-bioreactor (MBR) pilot. The city’s goal is up to 230 million gallons/day of purified recycled water and a 70% locally sourced water supply, compared with approximately 50% at the announcement. These are program targets and a reported baseline, not completed production or a full-plant EPC award.

[Stantec](https://www.stantec.com/en/news/2026/stantec-selected-los-angeles-bureau-sanitation-key-partner-advance-water-reuse)

## Engineering interpretation

Potable reuse depends on a coordinated chain of treatment barriers, monitoring and regulatory acceptance. A pilot can test process assumptions and inform operating procedures before a full-scale facility is defined. Conceptual engineering must also connect water-quality objectives with energy demand, residuals management and interfaces to existing plant operations. Program-management and pilot support do not transfer every construction package to the consultant. The local-supply percentage concerns the city’s water-source mix; the daily volume concerns the proposed reuse program. They describe different measures and should not be added together or read as today’s commissioned output. Pilot results also inform later design and regulatory acceptance decisions.

## Related company profiles

- [Stantec](https://voltformer.com/epc-contractors/stantec) · [Markdown](https://voltformer.com/epc-contractors/stantec.md)

## Other languages

- [en](https://voltformer.com/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [tr](https://voltformer.com/tr/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [de](https://voltformer.com/de/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [ru](https://voltformer.com/ru/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [es](https://voltformer.com/es/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [ar](https://voltformer.com/ar/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [it](https://voltformer.com/it/news/stantec-pure-water-los-angeles-conceptual-design-2026)
- [pt](https://voltformer.com/pt/news/stantec-pure-water-los-angeles-conceptual-design-2026)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
