{
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/oec-guaratuba-first-deck-installation-2026",
  "slug": "oec-guaratuba-first-deck-installation-2026",
  "category": "epc-contractors",
  "publishDate": "2026-02-17",
  "sourceDate": {
    "kind": "event",
    "value": "2026-02-17"
  },
  "sourceName": "OEC",
  "sourceUrl": "https://www.der.pr.gov.br/Noticia/Ponte-de-Guaratuba-chega-a-85-de-execucao-e-inicia-lancamento-de-vigas",
  "readingTimeMinutes": 1,
  "tags": [
    "OEC — Odebrecht Engenharia & Construção",
    "OEC (Odebrecht Engineering & Construction)"
  ],
  "content": {
    "title": "Guaratuba Bridge starts girder installation after passing 85% complete",
    "summary": "Paraná’s DER/PR highway department announced on 17 February 2026 that the bridge had passed 85% completion and girder installation had begun; OEC is a consortium partner.",
    "tags": [
      "OEC — Odebrecht Engenharia & Construção",
      "OEC (Odebrecht Engineering & Construction)"
    ],
    "sections": [
      {
        "heading": "What the source reports",
        "paragraphs": [
          "Paraná’s DER/PR highway department announced on 17 February 2026 that the bridge had passed 85% completion and girder installation had begun; OEC is a consortium partner."
        ],
        "sources": [
          {
            "name": "OEC",
            "url": "https://www.der.pr.gov.br/Noticia/Ponte-de-Guaratuba-chega-a-85-de-execucao-e-inicia-lancamento-de-vigas"
          }
        ]
      },
      {
        "heading": "EPC scope",
        "paragraphs": [
          "This record connects the company’s role in the project with a traceable primary source. EPC assessment should distinguish the owner, consortium partners, contracted package and physical progress. Cost, capacity or completion figures should not be inferred where the source does not state them."
        ]
      },
      {
        "heading": "Project context",
        "paragraphs": [
          "Infrastructure and industrial projects can split design, procurement, construction, commissioning and operations among different parties or packages. This item therefore describes the company role only to the extent the source defines it; owner-level goals are not presented as contractor commitments."
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "oec",
      "name": "OEC (Odebrecht Engineering & Construction)",
      "href": "/epc-contractors/oec",
      "website": "https://www.oec-eng.com/",
      "aliases": [
        "OEC (Odebrecht Engineering & Construction)",
        "أو إي سي",
        "OEC",
        "Odebrecht Engenharia e Construção"
      ]
    }
  ]
}
