# Nigeria grid operator reports normal operations after partial disturbance

> NISO said multiple trips on the 330 kV network around 12:40 p.m. on October 19 were stabilised with the Transmission Company of Nigeria and that normal operations had resumed.

- **Source date:** 2026-10-20
- **Original source:** [Okay News](https://www.okaynews.com/five-things-to-know-today-october-20-2026/)
- **Reading time:** 1 min read
- **Language:** English
- **URL:** https://voltformer.com/news/niso-reports-grid-restoration-after-disturbance
- **Markdown:** https://voltformer.com/news/niso-reports-grid-restoration-after-disturbance.md

## Nigeria grid operator reports normal operations after partial disturbance

NISO said multiple trips on the 330 kV network around 12:40 p.m. on October 19 were stabilised with the Transmission Company of Nigeria and that normal operations had resumed.

[Okay News](https://www.okaynews.com/five-things-to-know-today-october-20-2026/)

## Other languages

- [en](https://voltformer.com/news/niso-reports-grid-restoration-after-disturbance)
- [tr](https://voltformer.com/tr/news/niso-reports-grid-restoration-after-disturbance)
- [de](https://voltformer.com/de/news/niso-reports-grid-restoration-after-disturbance)
- [ru](https://voltformer.com/ru/news/niso-reports-grid-restoration-after-disturbance)
- [es](https://voltformer.com/es/news/niso-reports-grid-restoration-after-disturbance)
- [ar](https://voltformer.com/ar/news/niso-reports-grid-restoration-after-disturbance)
- [it](https://voltformer.com/it/news/niso-reports-grid-restoration-after-disturbance)
- [pt](https://voltformer.com/pt/news/niso-reports-grid-restoration-after-disturbance)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
