# Lycopodium awarded Twin Hills Gold Project EPCM

> Lycopodium announced an approximately A\$40m EPCM award from Osino Gold Exploration and Mining for Namibia’s Twin Hills Gold Project. Its scope covers a 5 Mtpa CIL plant and non-process infrastructure, including engineering, procurement, construction management and commissioning. First gold was forecast for Q1 2027 at award; this was a forecast, not a completed milestone.

- **Source date:** 2025-05-22
- **Original source:** [Lycopodium](https://www.lycopodium.com/wp-content/uploads/2025/05/Twin-Hills-Gold-Project_-Announcement_FINAL.pdf)
- **Reading time:** 2 min
- **Language:** en
- **URL:** https://voltformer.com/news/lycopodium-twin-hills-epcm
- **Markdown:** https://voltformer.com/news/lycopodium-twin-hills-epcm.md

## Reported scope and milestone

Lycopodium announced an approximately A\$40m EPCM award from Osino Gold Exploration and Mining for Namibia’s Twin Hills Gold Project. Its scope covers a 5 Mtpa CIL plant and non-process infrastructure, including engineering, procurement, construction management and commissioning. First gold was forecast for Q1 2027 at award; this was a forecast, not a completed milestone.

[Lycopodium](https://www.lycopodium.com/wp-content/uploads/2025/05/Twin-Hills-Gold-Project_-Announcement_FINAL.pdf)

## Engineering interpretation

Engineering interpretation: EPCM assigns Lycopodium engineering and procurement with construction management, while construction execution remains a separately managed interface. The 5 Mtpa CIL design and non-process infrastructure must be integrated, and the Q1 2027 first-gold date was prospective.

[Lycopodium](https://www.lycopodium.com/wp-content/uploads/2025/05/Twin-Hills-Gold-Project_-Announcement_FINAL.pdf)

## Delivery responsibilities

Under EPCM, the engineering firm coordinates design, procurement and construction management while the owner’s contracts define who supplies and builds each package. Procurement records, drawing revisions and site work need a common technical baseline. Acceptance responsibilities should cover equipment testing, quality records and commissioning interfaces. A management appointment therefore needs to be read with its authorized work scope; it does not establish a fixed-price turnkey commitment or prove that the facility is already producing at its planned rate.

[Lycopodium](https://www.lycopodium.com/wp-content/uploads/2025/05/Twin-Hills-Gold-Project_-Announcement_FINAL.pdf)

## Related company profiles

- [Lycopodium](https://voltformer.com/epc-contractors/lycopodium) · [Markdown](https://voltformer.com/epc-contractors/lycopodium.md)

## Other languages

- [en](https://voltformer.com/news/lycopodium-twin-hills-epcm)
- [tr](https://voltformer.com/tr/news/lycopodium-twin-hills-epcm)
- [de](https://voltformer.com/de/news/lycopodium-twin-hills-epcm)
- [ru](https://voltformer.com/ru/news/lycopodium-twin-hills-epcm)
- [es](https://voltformer.com/es/news/lycopodium-twin-hills-epcm)
- [ar](https://voltformer.com/ar/news/lycopodium-twin-hills-epcm)
- [it](https://voltformer.com/it/news/lycopodium-twin-hills-epcm)
- [pt](https://voltformer.com/pt/news/lycopodium-twin-hills-epcm)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
