# Lycopodium awarded Koné gold project engineering and CM

> Lycopodium announced engineering, procurement and construction-management contracts worth A\$56.7m from Montage Gold for the Koné project in Côte d’Ivoire. The scope covers an 11 Mtpa CIL plant and process-related infrastructure, including engineering, design, procurement, construction management and commissioning. Production was forecast for early 2027 and mine life estimated at 16 years in the 19 December 2024 release.

- **Source date:** 2024-12-19
- **Original source:** [Lycopodium](https://es.lycopodium.com/wp-content/uploads/2024/12/Kone-Gold-Project_-Announcement.pdf)
- **Reading time:** 2 min
- **Language:** en
- **URL:** https://voltformer.com/news/lycopodium-kone-epcm
- **Markdown:** https://voltformer.com/news/lycopodium-kone-epcm.md

## Reported scope and milestone

Lycopodium announced engineering, procurement and construction-management contracts worth A\$56.7m from Montage Gold for the Koné project in Côte d’Ivoire. The scope covers an 11 Mtpa CIL plant and process-related infrastructure, including engineering, design, procurement, construction management and commissioning. Production was forecast for early 2027 and mine life estimated at 16 years in the 19 December 2024 release.

[Lycopodium](https://es.lycopodium.com/wp-content/uploads/2024/12/Kone-Gold-Project_-Announcement.pdf)

## Engineering interpretation

Engineering interpretation: the disclosed role is engineering, procurement and construction management, not a single-turnkey EPC award. Plant capacity, mine life and production timing are project design/forecast parameters; commissioning and operation were prospective in this release.

[Lycopodium](https://es.lycopodium.com/wp-content/uploads/2024/12/Kone-Gold-Project_-Announcement.pdf)

## Delivery responsibilities

Under EPCM, the engineering firm coordinates design, procurement and construction management while the owner’s contracts define who supplies and builds each package. Procurement records, drawing revisions and site work need a common technical baseline. Acceptance responsibilities should cover equipment testing, quality records and commissioning interfaces. A management appointment therefore needs to be read with its authorized work scope; it does not establish a fixed-price turnkey commitment or prove that the facility is already producing at its planned rate.

[Lycopodium](https://es.lycopodium.com/wp-content/uploads/2024/12/Kone-Gold-Project_-Announcement.pdf)

## Related company profiles

- [Lycopodium](https://voltformer.com/epc-contractors/lycopodium) · [Markdown](https://voltformer.com/epc-contractors/lycopodium.md)

## Other languages

- [en](https://voltformer.com/news/lycopodium-kone-epcm)
- [tr](https://voltformer.com/tr/news/lycopodium-kone-epcm)
- [de](https://voltformer.com/de/news/lycopodium-kone-epcm)
- [ru](https://voltformer.com/ru/news/lycopodium-kone-epcm)
- [es](https://voltformer.com/es/news/lycopodium-kone-epcm)
- [ar](https://voltformer.com/ar/news/lycopodium-kone-epcm)
- [it](https://voltformer.com/it/news/lycopodium-kone-epcm)
- [pt](https://voltformer.com/pt/news/lycopodium-kone-epcm)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
