# Katsina wind farm remains stalled after two decades of shifting plans

> A Premium Times investigation traces the 10 MW Lambar-Rimi wind project, begun in 2005, through repeated delays; Katsina says it plans to pair the site with 10 MW of solar and target operation in late 2026.

- **Source date:** 2026-10-18
- **Original source:** [Premium Times](https://www.premiumtimesng.com/news/headlines/917951-stalled-wind-farm-project-in-katsina-typifies-nigerias-struggle-to-build-renewable-energy-industry.html)
- **Reading time:** 1 min read
- **Language:** English
- **URL:** https://voltformer.com/news/katsina-lambar-rimi-wind-farm-stalled
- **Markdown:** https://voltformer.com/news/katsina-lambar-rimi-wind-farm-stalled.md

## Katsina wind farm remains stalled after two decades of shifting plans

A Premium Times investigation traces the 10 MW Lambar-Rimi wind project, begun in 2005, through repeated delays; Katsina says it plans to pair the site with 10 MW of solar and target operation in late 2026.

[Premium Times](https://www.premiumtimesng.com/news/headlines/917951-stalled-wind-farm-project-in-katsina-typifies-nigerias-struggle-to-build-renewable-energy-industry.html)

## Other languages

- [en](https://voltformer.com/news/katsina-lambar-rimi-wind-farm-stalled)
- [tr](https://voltformer.com/tr/news/katsina-lambar-rimi-wind-farm-stalled)
- [de](https://voltformer.com/de/news/katsina-lambar-rimi-wind-farm-stalled)
- [ru](https://voltformer.com/ru/news/katsina-lambar-rimi-wind-farm-stalled)
- [es](https://voltformer.com/es/news/katsina-lambar-rimi-wind-farm-stalled)
- [ar](https://voltformer.com/ar/news/katsina-lambar-rimi-wind-farm-stalled)
- [it](https://voltformer.com/it/news/katsina-lambar-rimi-wind-farm-stalled)
- [pt](https://voltformer.com/pt/news/katsina-lambar-rimi-wind-farm-stalled)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
