{
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/jan-de-nul-dieppe-le-treport-final-turbine-2026",
  "slug": "jan-de-nul-dieppe-le-treport-final-turbine-2026",
  "category": "epc-contractors",
  "publishDate": "2026-04-29",
  "sourceName": "Jan De Nul Group",
  "sourceUrl": "https://www.jandenul.com/news/vole-au-vent-installs-final-turbine-wind-farm-france",
  "readingTimeMinutes": 1,
  "tags": [
    "Jan De Nul Group",
    "offshore wind turbine installation"
  ],
  "content": {
    "title": "Vole au vent installs final turbine at French wind farm",
    "summary": "On 29 April, vessel Vole au vent installed the last of 61 turbines at the Îles d’Yeu et de Noirmoutier offshore wind farm in France. Jan De Nul conducted the campaign with SGRE; the complete wind farm is rated at 500 MW.",
    "sections": [
      {
        "heading": "What the source reports",
        "paragraphs": [
          "On 29 April, vessel Vole au vent installed the last of 61 turbines at the Îles d’Yeu et de Noirmoutier offshore wind farm in France. Jan De Nul conducted the campaign with SGRE; the complete wind farm is rated at 500 MW."
        ],
        "sources": [
          {
            "name": "Jan De Nul Group",
            "url": "https://www.jandenul.com/news/vole-au-vent-installs-final-turbine-wind-farm-france"
          }
        ]
      },
      {
        "heading": "Contract and role boundary",
        "paragraphs": [
          "The release attributes only the stated tasks to Jan De Nul and names partners where delivery is shared. Total wind-farm or infrastructure capacity is not capacity owned or operated by the contractor."
        ],
        "sources": [
          {
            "name": "Jan De Nul Group",
            "url": "https://www.jandenul.com/news/vole-au-vent-installs-final-turbine-wind-farm-france"
          }
        ]
      },
      {
        "heading": "Project context",
        "paragraphs": [
          "Jan De Nul works across offshore energy, dredging, construction and remediation. Cable and foundation operations are delivered in campaigns; an order or milestone announcement does not mean that the wider project is complete."
        ],
        "sources": [
          {
            "name": "Jan De Nul Group",
            "url": "https://www.jandenul.com/news/vole-au-vent-installs-final-turbine-wind-farm-france"
          }
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "jan-de-nul",
      "name": "Jan De Nul Group",
      "href": "/epc-contractors/jan-de-nul",
      "website": "https://www.jandenul.com",
      "aliases": [
        "Jan De Nul Group",
        "جان دي نول",
        "Jan De Nul"
      ]
    }
  ]
}
