Archive: ENPRODE’s Livno energy partnership
ENPRODE announced a partnership for wind farms and pumped-storage hydropower in Livno, Bosnia and Herzegovina.
- Event date: 2017-10-28
- Category: EPC Contractors
- Original source: ENPRODE
- Reading time: 1 min
Details
The partnership combines regional wind and pumped-storage development. ENPRODE’s official archive includes its video record.
Partners and location
The regional government records the October 28, 2017 Livno signing by Pero Vrdoljak and Yüksel Güler for Široka Draga wind and pumped-storage development.
Vlada Hercegbosanske županije · Livno
Two operating modes
ENPRODE lists 1,120 MW pumping and 762 MW turbine design ratings for Široka Draga. These are distinct modes, not additive or confirmed operational capacity.
Wind development scope
ENPRODE lists site selection, wind measurement, feasibility, licensing, roads, transmission, substations and single-line/grid-connection studies as its general wind services.