Eiffage wins contracts for 300 MWp of solar plants in Spain
On 24 April 2025, Eiffage’s Spanish subsidiary won a €134 million turnkey contract for Everwood Capital’s Cabra (250 MWp) and Olivar (50 MWp) plants in Córdoba, including high-voltage connection and maintenance.
- Publish date: 2025-04-24
- Category: EPC Contractors
- Original source: Eiffage Énergie Systèmes
- Reading time: 1 min
Announced scope
On 24 April 2025, Eiffage’s Spanish subsidiary won a €134 million turnkey contract for Everwood Capital’s Cabra (250 MWp) and Olivar (50 MWp) plants in Córdoba, including high-voltage connection and maintenance.
Contract boundary
Eiffage Énergie Systèmes delivers electrical, automation and energy infrastructure packages. It may lead a group consortium or act through a JV or subcontract; client, technology-supplier and long-term operator roles are distinct.
Project follow-through
Connection capacity, generation, battery power and storage duration are different measures. Final acceptance, permits and commercial-operation dates should be verified separately from targets.