# DEWA Commissions 400 kV Substation to Connect Phase 6 of Mohammed bin Rashid Solar Park

> Dubai Electricity and Water Authority (DEWA) has commissioned a 400 kV transmission substation at the Mohammed bin Rashid Al Maktoum Solar Park to evacuate 1800 MW of solar power from Phase 6.

- **Source date:** 2026-10-04
- **Original source:** [Dubai Electricity and Water Authority Media Centre](https://www.dewa.gov.ae/en/about-us/media-publications/latest-news/2026/10/mbr-solar-park-phase-6-substation)
- **Reading time:** 1 min
- **Language:** en
- **URL:** https://voltformer.com/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026
- **Markdown:** https://voltformer.com/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026.md

## Advanced Digital Substation Architecture

The substation operates at 400 kV and 132 kV voltage levels and connects 4 autotransformers using digital process bus communications.

Advanced fibre-optic relay networks provide sub-cycle differential protection and instantaneous fault isolation across all outgoing feeder bays.

## Supporting Clean Energy Grid Targets

The substation supports the Dubai Clean Energy Strategy with 100% digital protection redundancy across the central transmission corridors.

High-capacity power transformers ensure efficient voltage step-up and stable dispatch into the emirate bulk supply grid.

## Other languages

- [en](https://voltformer.com/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [tr](https://voltformer.com/tr/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [de](https://voltformer.com/de/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [ru](https://voltformer.com/ru/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [es](https://voltformer.com/es/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [ar](https://voltformer.com/ar/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [it](https://voltformer.com/it/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)
- [pt](https://voltformer.com/pt/news/dewa-commissions-400kv-mbr-solar-park-phase-6-substation-october-2026)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
