{
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/deme-princess-elisabeth-final-caisson-2026",
  "slug": "deme-princess-elisabeth-final-caisson-2026",
  "category": "epc-contractors",
  "publishDate": "2026-01-29",
  "sourceName": "DEME Group",
  "sourceUrl": "https://deme-group.com/news/final-caisson-completed-princess-elisabeth-island",
  "readingTimeMinutes": 1,
  "tags": [
    "DEME Group",
    "offshore energy island foundation"
  ],
  "content": {
    "title": "Final caisson completed for Princess Elisabeth Island",
    "summary": "On 29 January, DEME reported that the 23rd concrete caisson had been built and floated at Vlissingen. DEME and Jan De Nul, through TM EDISON, are delivering the foundations for Elia Belgium; remaining offshore installation was due to resume in spring.",
    "sections": [
      {
        "heading": "What the source reports",
        "paragraphs": [
          "On 29 January, DEME reported that the 23rd concrete caisson had been built and floated at Vlissingen. DEME and Jan De Nul, through TM EDISON, are delivering the foundations for Elia Belgium; remaining offshore installation was due to resume in spring."
        ],
        "sources": [
          {
            "name": "DEME Group",
            "url": "https://deme-group.com/news/final-caisson-completed-princess-elisabeth-island"
          }
        ]
      },
      {
        "heading": "Contract and role boundary",
        "paragraphs": [
          "The release describes only DEME’s stated contract or delivery contribution. It does not establish project ownership, supply of every asset, or future operations unless the announcement expressly says so."
        ],
        "sources": [
          {
            "name": "DEME Group",
            "url": "https://deme-group.com/news/final-caisson-completed-princess-elisabeth-island"
          }
        ]
      },
      {
        "heading": "Project context",
        "paragraphs": [
          "Marine engineering combines vessels, coastal operations and seabed work; offshore campaigns depend on site conditions and coordinated phases. Read the update against the dates and project stages actually stated in the source."
        ],
        "sources": [
          {
            "name": "DEME Group",
            "url": "https://deme-group.com/news/final-caisson-completed-princess-elisabeth-island"
          }
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "deme",
      "name": "DEME Group",
      "href": "/epc-contractors/deme",
      "website": "https://www.deme-group.com",
      "aliases": [
        "DEME Group",
        "ديما",
        "DEME"
      ]
    }
  ]
}
