{
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/deme-norse-energi-delivery-2026",
  "slug": "deme-norse-energi-delivery-2026",
  "category": "epc-contractors",
  "publishDate": "2026-01-15",
  "sourceName": "DEME Group",
  "sourceUrl": "https://deme-group.com/news/deme-takes-delivery-its-second-new-wind-turbine-installation-vessel-norse-energi",
  "readingTimeMinutes": 1,
  "tags": [
    "DEME Group",
    "offshore wind installation vessel"
  ],
  "content": {
    "title": "DEME takes delivery of offshore wind installation vessel Norse Energi",
    "summary": "On 15 January 2026, DEME announced delivery of Norse Energi at CIMC Raffles Shipyard. The sister vessel to Norse Wind is designed for turbines with rotor diameters above 300 metres and monopiles up to 3,000 tonnes.",
    "sections": [
      {
        "heading": "What the source reports",
        "paragraphs": [
          "On 15 January 2026, DEME announced delivery of Norse Energi at CIMC Raffles Shipyard. The sister vessel to Norse Wind is designed for turbines with rotor diameters above 300 metres and monopiles up to 3,000 tonnes."
        ],
        "sources": [
          {
            "name": "DEME Group",
            "url": "https://deme-group.com/news/deme-takes-delivery-its-second-new-wind-turbine-installation-vessel-norse-energi"
          }
        ]
      },
      {
        "heading": "Contract and role boundary",
        "paragraphs": [
          "The release describes only DEME’s stated contract or delivery contribution. It does not establish project ownership, supply of every asset, or future operations unless the announcement expressly says so."
        ],
        "sources": [
          {
            "name": "DEME Group",
            "url": "https://deme-group.com/news/deme-takes-delivery-its-second-new-wind-turbine-installation-vessel-norse-energi"
          }
        ]
      },
      {
        "heading": "Project context",
        "paragraphs": [
          "Marine engineering combines vessels, coastal operations and seabed work; offshore campaigns depend on site conditions and coordinated phases. Read the update against the dates and project stages actually stated in the source."
        ],
        "sources": [
          {
            "name": "DEME Group",
            "url": "https://deme-group.com/news/deme-takes-delivery-its-second-new-wind-turbine-installation-vessel-norse-energi"
          }
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "deme",
      "name": "DEME Group",
      "href": "/epc-contractors/deme",
      "website": "https://www.deme-group.com",
      "aliases": [
        "DEME Group",
        "ديما",
        "DEME"
      ]
    }
  ]
}
