# Selected for Pagabo Civil Engineering and Infrastructure Framework

> [Costain](https://voltformer.com/epc-contractors/costain) is one of three collaborative partners for the four-year England-and-Wales framework; £4.29 billion is the framework estimate, not Costain revenue or the value of one project.

- **Source date:** 2026-10-01
- **Original source:** [Costain](https://www.costain.com/news/press-releases/2026/costain-selected-by-pagabo-for-landmark-civil-engineering-infrastructure-framework/)
- **Reading time:** 1 min
- **Language:** en
- **URL:** https://voltformer.com/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework
- **Markdown:** https://voltformer.com/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework.md

## Reported scope and milestone

Costain: Costain is one of three collaborative partners for the four-year England-and-Wales framework; £4.29 billion is the framework estimate, not Costain revenue or the value of one project.

[Costain](https://www.costain.com/news/press-releases/2026/costain-selected-by-pagabo-for-landmark-civil-engineering-infrastructure-framework/)

## Engineering interpretation

Framework selection establishes access to a four-year procurement route with three collaborative partners; it is not an instruction to deliver a single £4.29 billion project.

[Costain](https://www.costain.com/news/press-releases/2026/costain-selected-by-pagabo-for-landmark-civil-engineering-infrastructure-framework/)

## Delivery responsibilities

Engineering, design, assessment and advisory appointments must be read within their documented package. The consultant may support planning, approvals, technical decisions or construction interfaces while other parties supply equipment and execute the works. Proposed capacity belongs to the future asset and does not establish present output. Design acceptance, permits and construction completion are separate milestones. The reported role supports those decisions without transferring ownership, operation or all construction responsibility to the consultant; subsequent delivery commitments require their own source evidence.

[Costain](https://www.costain.com/news/press-releases/2026/costain-selected-by-pagabo-for-landmark-civil-engineering-infrastructure-framework/)

## Related company profiles

- [Costain](https://voltformer.com/epc-contractors/costain) · [Markdown](https://voltformer.com/epc-contractors/costain.md)

## Other languages

- [en](https://voltformer.com/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [tr](https://voltformer.com/tr/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [de](https://voltformer.com/de/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [ru](https://voltformer.com/ru/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [es](https://voltformer.com/es/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [ar](https://voltformer.com/ar/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [it](https://voltformer.com/it/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)
- [pt](https://voltformer.com/pt/news/costain-2026-10-01-selected-for-pagabo-civil-engineering-and-infrastructure-framework)

[Company and energy news](https://voltformer.com/news.md) · [Voltformer catalog](https://voltformer.com/catalog)
