{
  "language": "en",
  "interfaceLanguage": "en",
  "url": "https://voltformer.com/news/aneel-renewables-hydro-curtailment-sharing-rule-october-2026",
  "slug": "aneel-renewables-hydro-curtailment-sharing-rule-october-2026",
  "category": "policy-standards",
  "publishDate": "2026-10-06",
  "sourceName": "Agência iNFRA",
  "sourceUrl": "https://agenciainfra.com/blog/reguladora-decide-ratear-prejuizo-de-curtailment-entre-renovaveis/",
  "readingTimeMinutes": 1,
  "tags": [
    "Brazil",
    "Electricity regulation",
    "Curtailment",
    "Renewables",
    "October 2026"
  ],
  "content": {
    "title": "ANEEL approves staged hydropower participation in renewable curtailment sharing",
    "summary": "Brazil’s regulator approved a new approach to sharing energy-related generation cuts, with hydropower entering the mechanism gradually after testing.",
    "sections": [
      {
        "heading": "A shared rule for renewable cuts",
        "paragraphs": [
          "ANEEL’s board voted 4–1 on 6 October to share energy-related curtailment across wind, solar and eligible hydropower plants. Hydropower units with turbinable spilled energy will join in stages after the system preparation and shadow-testing periods. The decision concludes the third phase of Public Consultation 45/2019, which has addressed operating criteria for reducing or limiting generation in the national grid."
        ],
        "sources": [
          {
            "name": "Agência iNFRA",
            "url": "https://agenciainfra.com/blog/reguladora-decide-ratear-prejuizo-de-curtailment-entre-renovaveis/"
          }
        ]
      },
      {
        "heading": "Hydro participation will ramp up",
        "paragraphs": [
          "ONS receives six months to prepare its systems, followed by a 12-month shadow period before the rule takes effect. Hydropower’s eligible share then rises through four cycles: 25%, 50%, 75% and 100%. The vote concerns energy-related cuts; ANEEL will separately review whether cuts classified as external availability or electrical reliability should be reclassified."
        ],
        "sources": [
          {
            "name": "Agência iNFRA",
            "url": "https://agenciainfra.com/blog/reguladora-decide-ratear-prejuizo-de-curtailment-entre-renovaveis/"
          }
        ]
      }
    ]
  },
  "companies": []
}
