{
  "language": "en",
  "interfaceLanguage": "it",
  "url": "https://voltformer.com/it/news/worley-inpex-abadi-lng-ccs-feeds-2026",
  "slug": "worley-inpex-abadi-lng-ccs-feeds-2026",
  "category": "epc-contractors",
  "publishDate": "2026-09-16",
  "sourceName": "Worley",
  "sourceUrl": "https://www.worley.com/en/insights/our-news/conventional-energy/2026/delivers-feeds-indonesia-flagship-lng-and-ccs-development",
  "readingTimeMinutes": 2,
  "tags": [
    "Worley Limited"
  ],
  "content": {
    "title": "Worley delivers Abadi LNG and CCS FEEDs",
    "summary": "Planning LNG and carbon transport together creates interfaces across subsea routes and facility boundaries.",
    "sections": [
      {
        "heading": "Scope of the official announcement",
        "paragraphs": [
          "Worley delivered offshore infrastructure, gas-export and CCS-pipeline FEEDs for INPEX’s Abadi LNG development in Indonesia."
        ],
        "sources": [
          {
            "name": "Worley",
            "url": "https://www.worley.com/en/insights/our-news/conventional-energy/2026/delivers-feeds-indonesia-flagship-lng-and-ccs-development"
          }
        ]
      },
      {
        "heading": "Voltformer analysis",
        "paragraphs": [
          "Planning LNG and carbon transport together creates interfaces across subsea routes and facility boundaries. Assessing FEED delivery can include calculation maturity and unresolved execution decisions. Delivery of a design package should remain distinct from commissioning the facility."
        ]
      },
      {
        "heading": "Considerations for project teams",
        "paragraphs": [
          "Early engineering establishes the technical basis for an investment decision. Design assumptions, plant boundaries, utilities and the maturity of cost estimates should be read together. A design contract award does not itself establish that construction has started. Teams benefit from a delivery register covering calculations, drawings, equipment specifications and outstanding decisions. Recording the conditions that could change the design is equally useful before execution. This makes engineering progress understandable while keeping unresolved funding, permitting and delivery responsibilities visible as separate project decisions."
        ]
      }
    ]
  },
  "companies": [
    {
      "slug": "worley",
      "name": "Worley Limited",
      "href": "/it/epc-contractors/worley",
      "website": "https://www.worley.com",
      "aliases": [
        "Worley Limited",
        "وورلي",
        "Worley"
      ]
    }
  ]
}
