{
  "language": "en",
  "url": "https://voltformer.com/epc-contractors/techint-engineering",
  "company": {
    "id": "techint-engineering",
    "slug": "techint-engineering",
    "name": "Techint Engineering & Construction",
    "country": "Argentina",
    "countryCode": "AR",
    "headquarters": "Buenos Aires, Argentina; international engineering network",
    "foundedYear": 1945,
    "website": "https://www.techint.com/en",
    "logo": "/logos/techint-engineering.svg",
    "tagline": "Integrated EPC for power, pipelines, mining water and industrial plants",
    "overview": "Techint Engineering & Construction is the engineering and construction business of the Techint Group, with a regional headquarters in Buenos Aires and an international engineering network. Its corporate history starts in 1945 with Compagnia Tecnica Internazionale. It delivers engineering, procurement, construction and project management for power, oil and gas, mining, downstream processing and industrial infrastructure. Project roles vary: its references include full EPC delivery, construction in joint ventures and Owner’s Engineer services. These roles are stated separately rather than treating every assignment as a turnkey contract.",
    "specialization": [
      "Combined-cycle power generation and electrical balance of plant",
      "Oil and gas pipelines and processing facilities",
      "Desalination and water supply for mining",
      "Steelmaking and other industrial plants"
    ],
    "sectors": [
      "power-generation",
      "substations-transmission",
      "industrial-plants",
      "oil-gas-energy"
    ],
    "services": [
      {
        "name": "Integrated EPC delivery",
        "description": "Engineering, procurement and construction of contract-defined energy, water and industrial facilities."
      },
      {
        "name": "Engineering and project management",
        "description": "Studies, detailed design, multidisciplinary coordination and Owner’s Engineer support according to the appointment."
      },
      {
        "name": "Construction and commissioning",
        "description": "Civil works, mechanical erection, piping, electrical installation, testing and pre-commissioning of the contracted facilities."
      },
      {
        "name": "Pipeline and water infrastructure",
        "description": "Integrated delivery of pipelines, pumping systems and associated terminal or mine-water infrastructure."
      }
    ],
    "turnkeyCapabilities": {
      "engineeringDesign": true,
      "procurementSupply": true,
      "constructionCivil": true,
      "commissioningTesting": true,
      "substationEpc": true,
      "highVoltageTransmission": false,
      "powerPlantEpc": true,
      "gridInterconnection": true
    },
    "keyProjects": [
      {
        "title": "Pesquería Power Station",
        "client": "Techgen SA de CV",
        "country": "Mexico",
        "capacityOrScope": "900 MW combined-cycle plant and 400 kV electrical substation",
        "completionYear": 2016,
        "description": "Techint delivered the power station under an EPC scope for the industrial energy supply of Tenaris and Ternium. The official project record distinguishes plant capacity and substation voltage and gives the construction end as December 2016.",
        "technologies": [
          "CCGT",
          "400 kV substation",
          "Industrial power supply"
        ],
        "sourceUrl": "https://www.techint.com/en/our-projects/central-electrica-pesqueria"
      },
      {
        "title": "Vaca Muerta Oil Sur pipeline",
        "client": "VMOS S.A.",
        "country": "Argentina",
        "capacityOrScope": "437 km pipeline, terminals and associated facilities",
        "completionYear": 2026,
        "description": "The Techint–SACDE joint venture executed the EPC project. The company reported construction and pre-commissioning completion in 2026; this milestone does not by itself establish commercial operation of the complete export system.",
        "technologies": [
          "Oil pipeline",
          "HDD crossings",
          "Pre-commissioning"
        ],
        "sourceUrl": "https://www.techint.com/en/news/2026/the-power-of-unity-we-completed-construction-of-vaca-muerta-oil-sur-vmos"
      },
      {
        "title": "SADDN Northern District desalinated water supply",
        "client": "Aguas Horizonte",
        "country": "Chile",
        "capacityOrScope": "840 L/s design production and more than 160 km of pipelines",
        "description": "Techint’s EPC scope integrates seawater intake, desalination, pumping and distribution to mining operations. Desalinated water reached the Radomiro Tomic reservoir in June 2026, during progressive system validation and commissioning.",
        "technologies": [
          "RO desalination",
          "Pumping stations",
          "Mine-water distribution"
        ],
        "sourceUrl": "https://www.techint.com/en/news/2026/techint-ec-reaches-new-milestone-in-one-of-chile-s-largest-water-infrastructure-projects-for-mining"
      }
    ],
    "certifications": [],
    "trackRecordCapacityMW": 14000,
    "highlightStats": [
      {
        "label": "Corporate roots",
        "value": "1945"
      },
      {
        "label": "Engineering centers",
        "value": "9"
      },
      {
        "label": "Combined-cycle installed capacity reported by the company",
        "value": "14000+ MW"
      }
    ],
    "contactInfo": {
      "address": "Bouchard 557, Buenos Aires, Argentina",
      "phone": "+54 11 4018 4100",
      "website": "https://www.techint.com/en",
      "inquiryUrl": "https://www.techint.com/en/contact"
    },
    "sources": [
      {
        "name": "Techint E&C · Corporate history, capabilities and offices",
        "url": "https://www.techint.com/en/about-us"
      },
      {
        "name": "Techint E&C · Pesquería project",
        "url": "https://www.techint.com/en/our-projects/central-electrica-pesqueria"
      },
      {
        "name": "Techint E&C · VMOS construction milestone",
        "url": "https://www.techint.com/en/news/2026/the-power-of-unity-we-completed-construction-of-vaca-muerta-oil-sur-vmos"
      },
      {
        "name": "Techint E&C · SADDN milestone",
        "url": "https://www.techint.com/en/news/2026/techint-ec-reaches-new-milestone-in-one-of-chile-s-largest-water-infrastructure-projects-for-mining"
      }
    ]
  },
  "leadership": {
    "name": "Oscar Scarpari",
    "since": "2023",
    "verifiedOn": "2026-10-10",
    "role": {
      "en": "Director and Chief Executive Officer",
      "tr": "Direktör ve CEO",
      "de": "Direktor und Chief Executive Officer",
      "ru": "Директор и генеральный директор",
      "es": "Director y director ejecutivo",
      "ar": "عضو الإدارة والمدير التنفيذي",
      "it": "Direttore e amministratore delegato",
      "pt": "Diretor e diretor executivo"
    },
    "biography": {
      "en": "Oscar Scarpari has been CEO of Techint Engineering & Construction since 2023 and is a director. An Argentine aeronautical mechanical engineer educated at the National University of Córdoba, he holds an Executive MBA from IAE Business School and attended Harvard’s Advanced Management Program. He previously led the Andean Region and held project and business-development roles.",
      "tr": "Oscar Scarpari, 2023’ten beri Techint Engineering & Construction’ın CEO’su ve direktörüdür. Córdoba Ulusal Üniversitesi’nde eğitim alan Arjantinli havacılık makine mühendisidir; IAE Business School’dan Executive MBA derecesi almış ve Harvard’ın Advanced Management Programına katılmıştır. Daha önce And Bölgesi’ni yönetmiş, proje ve iş geliştirme görevleri üstlenmiştir.",
      "de": "Oscar Scarpari ist seit 2023 CEO von Techint Engineering & Construction und Direktor. Der argentinische Luftfahrt-Maschinenbauingenieur studierte an der Nationaluniversität Córdoba, erwarb einen Executive MBA an der IAE Business School und absolvierte Harvards Advanced Management Program. Zuvor leitete er die Andenregion und übernahm Projekt- und Geschäftsentwicklungsaufgaben.",
      "ru": "Оскар Скарпари — CEO Techint Engineering & Construction с 2023 года и член руководства. Аргентинский авиационный инженер-механик окончил Национальный университет Кордовы, получил Executive MBA в IAE Business School и прошёл Advanced Management Program Гарварда. Ранее руководил Андским регионом и занимался проектами и развитием бизнеса.",
      "es": "Oscar Scarpari es CEO de Techint Engineering & Construction desde 2023 y director. Es ingeniero mecánico aeronáutico argentino, graduado en la Universidad Nacional de Córdoba, con Executive MBA de IAE Business School y formación en el Advanced Management Program de Harvard. Antes presidió la Región Andina y ocupó funciones de proyectos y desarrollo comercial.",
      "ar": "أوسكار سكاربارّي هو المدير التنفيذي لشركة Techint Engineering & Construction منذ 2023 وعضو الإدارة. مهندس ميكانيكي للطيران من الأرجنتين، تخرج في جامعة قرطبة الوطنية، ويحمل Executive MBA من IAE Business School، ودرس برنامج Advanced Management Program في هارفارد. سبق أن قاد منطقة الأنديز وتولى مهام المشروعات وتطوير الأعمال.",
      "it": "Oscar Scarpari è CEO di Techint Engineering & Construction dal 2023 e direttore. Ingegnere meccanico aeronautico argentino laureato all’Università Nazionale di Córdoba, ha un Executive MBA della IAE Business School e ha frequentato l’Advanced Management Program di Harvard. In precedenza ha guidato la Regione Andina e ricoperto incarichi di progetto e sviluppo commerciale.",
      "pt": "Oscar Scarpari é CEO da Techint Engineering & Construction desde 2023 e diretor. Engenheiro mecânico aeronáutico argentino formado na Universidade Nacional de Córdoba, possui Executive MBA da IAE Business School e participou do Advanced Management Program de Harvard. Antes liderou a Região Andina e ocupou funções de projetos e desenvolvimento de negócios."
    },
    "sources": [
      {
        "name": "Techint E&C · Annual report 2025, published in 2026",
        "url": "https://www.techint.com/media/32tppjnu/tec_ar2025_eng_vf.pdf"
      },
      {
        "name": "Techint E&C · Current events and CEO statements",
        "url": "https://www.techint.com/en/news?filter=events"
      }
    ]
  },
  "news": [
    {
      "title": "Techint advances Ternium’s new Pesquería steel mill into final construction",
      "url": "https://voltformer.com/news/techint-ternium-pesqueria-final-construction-stage-2026"
    },
    {
      "title": "Techint reports first firing at Ostiglia’s new 880 MW unit",
      "url": "https://voltformer.com/news/techint-ostiglia-first-firing-owners-engineer-2026"
    },
    {
      "title": "Techint completes the final regular-line weld on Duplicar Norte",
      "url": "https://voltformer.com/news/techint-duplicar-norte-final-regular-line-weld-2026"
    },
    {
      "title": "Techint–SACDE reports VMOS construction and pre-commissioning completion",
      "url": "https://voltformer.com/news/techint-vmos-construction-precommissioning-complete-2026"
    },
    {
      "title": "Techint details the Duplicar Norte EPC transport corridor",
      "url": "https://voltformer.com/news/techint-duplicar-norte-capacity-expansion-2026"
    },
    {
      "title": "Techint’s SADDN project delivers first desalinated water to Radomiro Tomic",
      "url": "https://voltformer.com/news/techint-saddn-first-water-radomiro-tomic-2026"
    },
    {
      "title": "Techint advances the SADDN reservoir at Radomiro Tomic",
      "url": "https://voltformer.com/news/techint-saddn-radomiro-tomic-reservoir-final-stage-2026"
    }
  ]
}
