{
  "language": "en",
  "url": "https://voltformer.com/epc-contractors/stantec",
  "company": {
    "id": "stantec",
    "slug": "stantec",
    "name": "Stantec",
    "legalName": "Stantec Inc.",
    "country": "Canada",
    "headquarters": "Edmonton, Alberta, Canada",
    "tagline": "Engineering and environmental consultancy for energy, water and resources",
    "overview": "Stantec is a Canadian engineering, design and environmental consulting company founded in Edmonton in 1954. It supports energy systems, renewable integration, nuclear programs, water infrastructure and mining studies through multidisciplinary professional services. Representative appointments include client-side project management, engineering design, feasibility studies and construction administration. Preparing an EPCM bid package does not mean that Stantec holds the subsequent construction contract. The listed references identify the company’s consulting responsibilities and distinguish program targets from facilities already in operation.",
    "specialization": [
      "Renewable integration and power systems",
      "Nuclear engineering and environmental advice",
      "Water treatment and resilient infrastructure",
      "Mining feasibility and underground systems"
    ],
    "services": [
      {
        "name": "Energy engineering",
        "description": "Power system studies, renewable integration, grid controls and technical nuclear support."
      },
      {
        "name": "Feasibility and project definition",
        "description": "Design trade-offs, cost and risk studies, execution planning and EPCM tender documentation."
      },
      {
        "name": "Client-side project management",
        "description": "Program coordination, technical interfaces, delivery assurance and construction administration within the appointment."
      },
      {
        "name": "Water and environmental consulting",
        "description": "Treatment process design, environmental assessment, permitting and resilient water infrastructure."
      }
    ],
    "keyProjects": [
      {
        "title": "Palau Renewable Energy Integration Project",
        "client": "AIFFP",
        "country": "Palau",
        "capacityOrScope": "Client-side project management; renewable electricity target up to 25%",
        "description": "Appointed for project management and technical advice on staged grid and control upgrades and future battery planning. The renewable share is a program goal, not a verified operating result.",
        "technologies": [
          "Grid integration",
          "Network controls",
          "BESS planning"
        ],
        "sourceUrl": "https://www.stantec.com/en/news/2026/stantec-appointed-support-delivery-palau-renewable-energy-integration-project"
      },
      {
        "title": "UK nuclear professional services frameworks",
        "client": "NNB GenCo / Sizewell C / EDF",
        "country": "United Kingdom",
        "capacityOrScope": "4 professional services frameworks; initial 5-year terms with 5-year extension options",
        "description": "Technical, safety, environmental and program advice supports new-build and existing nuclear sites. The appointments are consulting frameworks, not whole-station construction awards or guaranteed orders for every optional year.",
        "technologies": [
          "Nuclear safety",
          "Environmental permitting",
          "Engineering advisory"
        ],
        "sourceUrl": "https://www.stantec.com/en/news/2026/stantec-appointed-four-major-nuclear-frameworks-uk"
      },
      {
        "title": "Kingking copper-gold definitive feasibility study",
        "client": "St. Augustine Gold & Copper Ltd.",
        "country": "Philippines",
        "capacityOrScope": "Definitive feasibility study for a deposit reporting 960 million tonnes of reserves",
        "description": "Stantec leads studies, engineering, cost estimation and reporting with Independent Mining Consultants. It prepares an EPCM bid package and procurement strategy; these deliverables do not establish an awarded mine construction contract.",
        "technologies": [
          "NI 43-101",
          "EPCM tender planning",
          "Mining feasibility"
        ],
        "sourceUrl": "https://www.stantec.com/en/news/2026/stantec-selected-lead-definitive-feasibility-study-kingking-copper-gold-project-philippines"
      }
    ],
    "highlightStats": [
      {
        "label": "Founded in Edmonton",
        "value": "1954"
      },
      {
        "label": "Public listings",
        "value": "TSX / NYSE: STN"
      },
      {
        "label": "Global headquarters",
        "value": "Edmonton"
      }
    ],
    "foundedYear": 1954,
    "countryCode": "CA",
    "website": "https://www.stantec.com",
    "logo": "/logos/stantec.svg",
    "sectors": [
      "power-generation",
      "renewable-energy",
      "substations-transmission",
      "nuclear-energy",
      "industrial-plants",
      "energy-storage-bess"
    ],
    "turnkeyCapabilities": {
      "engineeringDesign": true,
      "procurementSupply": false,
      "constructionCivil": false,
      "commissioningTesting": false,
      "substationEpc": false,
      "highVoltageTransmission": false,
      "powerPlantEpc": false,
      "gridInterconnection": true
    },
    "certifications": [],
    "contactInfo": {
      "address": "Edmonton, Alberta, Canada",
      "website": "https://www.stantec.com",
      "inquiryUrl": "https://www.stantec.com/en/about/contact-us"
    },
    "sources": [
      {
        "name": "Stantec · Canadian origins and corporate history",
        "url": "https://www.stantec.com/en/news-media/2025/stantec-successfully-completes-150th-acquisition"
      },
      {
        "name": "Stantec · Current global headquarters",
        "url": "https://www.stantec.com/en/offices/canada-locations/alberta-offices/edmonton-alberta-office.html"
      },
      {
        "name": "Stantec · Palau appointment",
        "url": "https://www.stantec.com/en/news/2026/stantec-appointed-support-delivery-palau-renewable-energy-integration-project"
      },
      {
        "name": "Stantec · UK nuclear frameworks",
        "url": "https://www.stantec.com/en/news/2026/stantec-appointed-four-major-nuclear-frameworks-uk"
      },
      {
        "name": "Stantec · Kingking study scope",
        "url": "https://www.stantec.com/en/news/2026/stantec-selected-lead-definitive-feasibility-study-kingking-copper-gold-project-philippines"
      },
      {
        "name": "Stantec · Palau Renewable Energy Integration Project",
        "url": "https://www.stantec.com/en/news/2026/stantec-appointed-support-delivery-palau-renewable-energy-integration-project"
      },
      {
        "name": "Stantec · UK nuclear professional services frameworks",
        "url": "https://www.stantec.com/en/news/2026/stantec-appointed-four-major-nuclear-frameworks-uk"
      },
      {
        "name": "Stantec · Kingking copper-gold definitive feasibility study",
        "url": "https://www.stantec.com/en/news/2026/stantec-selected-lead-definitive-feasibility-study-kingking-copper-gold-project-philippines"
      }
    ]
  },
  "leadership": {
    "name": "Susan Reisbord",
    "role": {
      "en": "President and Chief Executive Officer",
      "tr": "Başkan ve İcra Kurulu Başkanı",
      "de": "Präsidentin und Chief Executive Officer",
      "ru": "Президент и генеральный директор",
      "es": "Presidenta y directora ejecutiva",
      "ar": "الرئيسة والمديرة التنفيذية",
      "it": "Presidente e amministratore delegato",
      "pt": "Presidente e diretora executiva"
    },
    "since": "2026-10-01",
    "verifiedOn": "2026-10-10",
    "biography": {
      "en": "Susan Reisbord became president and CEO of Stantec on October 1, 2026, succeeding Gord Johnston. She joined Stantec through the Cardno acquisition in 2021, having been Cardno’s CEO. After leading Environmental Services, she became North America chief operating officer in 2025. The official succession announcement describes extensive industry experience and responsibility for operational performance, growth and the next strategic plan.",
      "tr": "Susan Reisbord, Gord Johnston’ın ardından 1 Ekim 2026’da Stantec başkanı ve CEO’su oldu. Daha önce Cardno CEO’suyken 2021’deki satın almayla Stantec’e katıldı. Çevre Hizmetlerini yönettikten sonra 2025’te Kuzey Amerika operasyon direktörü oldu. Resmi değişim açıklaması kapsamlı sektör deneyimini; operasyonel performans, büyüme ve sonraki stratejik plandaki sorumluluğunu anlatır.",
      "de": "Susan Reisbord wurde am 1. Oktober 2026 Präsidentin und CEO von Stantec als Nachfolgerin von Gord Johnston. Sie kam 2021 durch die Cardno-Übernahme, zuvor war sie dort CEO. Nach der Leitung der Umweltsparte wurde sie 2025 COO für Nordamerika. Die offizielle Nachfolgemeldung beschreibt umfangreiche Branchenerfahrung und Verantwortung für Leistung, Wachstum und den nächsten Strategieplan.",
      "ru": "Susan Reisbord стала президентом и генеральным директором Stantec 1 октября 2026 года, сменив Gord Johnston. Она присоединилась при приобретении Cardno в 2021 году, ранее возглавляя Cardno. После руководства экологическими услугами стала операционным директором Северной Америки в 2025 году. Официальное сообщение описывает отраслевой опыт и ответственность за результаты, рост и следующий стратегический план.",
      "es": "Susan Reisbord asumió como presidenta y CEO de Stantec el 1 de octubre de 2026, sucediendo a Gord Johnston. Se incorporó con la adquisición de Cardno en 2021, donde había sido CEO. Tras dirigir Servicios Ambientales, fue nombrada directora operativa de Norteamérica en 2025. El anuncio oficial describe experiencia sectorial y responsabilidad por desempeño, crecimiento y el próximo plan estratégico.",
      "ar": "أصبحت Susan Reisbord رئيسة Stantec ومديرتها التنفيذية في 1 أكتوبر 2026، خلفاً لـ Gord Johnston. انضمت باستحواذ Cardno في 2021 وكانت مديرتها التنفيذية سابقاً. بعد قيادة الخدمات البيئية، أصبحت مديرة عمليات أمريكا الشمالية في 2025. يصف الإعلان الرسمي خبرتها ومسؤوليتها عن الأداء والنمو والخطة الاستراتيجية التالية.",
      "it": "Susan Reisbord è diventata presidente e CEO di Stantec il 1 ottobre 2026, succedendo a Gord Johnston. È entrata con l’acquisizione di Cardno nel 2021, dove era CEO. Dopo la guida dei Servizi Ambientali, nel 2025 è diventata direttrice operativa per il Nord America. L’annuncio ufficiale descrive esperienza e responsabilità per risultati, crescita e prossimo piano strategico.",
      "pt": "Susan Reisbord tornou-se presidente e CEO da Stantec em 1 de outubro de 2026, sucedendo Gord Johnston. Ingressou com a aquisição da Cardno em 2021, onde era CEO. Após liderar Serviços Ambientais, tornou-se diretora de operações da América do Norte em 2025. O anúncio oficial descreve experiência e responsabilidade por desempenho, crescimento e o próximo plano estratégico."
    },
    "sources": [
      {
        "name": "Stantec · Official succession announcement and effective date",
        "url": "https://www.stantec.com/en/news/2026/gord-johnston-transition-vice-chair-stantec-board-directors"
      },
      {
        "name": "Stantec · Susan Reisbord career biography (earlier role label)",
        "url": "https://www.stantec.com/en/people/r/reisbord-susan"
      }
    ]
  },
  "news": [
    {
      "title": "Stantec appointed to design Toronto’s 600 million litres/day treatment facility",
      "url": "https://voltformer.com/news/stantec-toronto-high-rate-treatment-design-2026"
    },
    {
      "title": "Stantec joins the Pure Water Los Angeles engineering program",
      "url": "https://voltformer.com/news/stantec-pure-water-los-angeles-conceptual-design-2026"
    },
    {
      "title": "Stantec selected for Woodsmith shaft and underground feasibility engineering",
      "url": "https://voltformer.com/news/stantec-woodsmith-shafts-hoisting-feasibility-2026"
    },
    {
      "title": "Stantec announces Susan Reisbord’s CEO appointment effective October 1",
      "url": "https://voltformer.com/news/stantec-susan-reisbord-ceo-succession-2026"
    },
    {
      "title": "Stantec appointed to manage Palau’s renewable integration program for the client",
      "url": "https://voltformer.com/news/stantec-palau-renewable-integration-owner-project-management-2026"
    },
    {
      "title": "Stantec appointed to 4 UK nuclear professional-services frameworks",
      "url": "https://voltformer.com/news/stantec-uk-four-nuclear-professional-services-frameworks-2026"
    },
    {
      "title": "Stantec to lead Kingking feasibility and prepare the EPCM tender package",
      "url": "https://voltformer.com/news/stantec-kingking-definitive-feasibility-epcm-tender-2026"
    }
  ]
}
