    "name": "POWERCHINA",
    "legalName": "Power Construction Corporation of China",
    "country": "China",
    "countryCode": "CN",
    "headquarters": "Beijing, China",
    "foundedYear": 2011,
    "website": "https://en.powerchina.cn",
    "logo": "/logos/powerchina.svg",
    "tagline": "Renewable energy EPC · Transmission and substation EPC · Hydropower engineering and construction",
    "overview": "POWERCHINA is the international name of Beijing-based Power Construction Corporation of China, formed in 2011. Through design institutes and construction businesses, the group delivers energy, hydropower, transmission, renewable generation, water and infrastructure work. Project roles can include EPC, defined construction or investment partnerships. The Peru, Colombia and Brazil references identify disclosed delivery scopes. Building a project does not imply sole ownership of the entire asset.",
    "specialization": [
      "Renewable energy EPC",
      "Transmission and substation EPC",
      "Hydropower engineering and construction",
      "Building and infrastructure construction"
    ],
    "sectors": [
      "power-generation",
      "renewable-energy",
      "substations-transmission",
      "industrial-plants",
      "energy-storage-bess"
    ],
    "services": [
      {
        "name": "Renewable energy EPC",
        "description": "Renewable facilities distinguish generation-equipment installation, energy collection and grid connection as separate progress stages. Protection, site testing and utility acceptance influence overall delivery. This engineering interpretation explains why the announced physical capacity must be read alongside the stated completion or operating milestone."
      },
      {
        "name": "Transmission and substation EPC",
        "description": "For transmission delivery, the important interface is how the line and substation operate together. Protection coordination, power transformers, site testing and utility acceptance require separate execution packages. This engineering interpretation explains why the disclosed grid scope matters."
      },
      {
        "name": "Hydropower engineering and construction",
        "description": "Hydropower requires coordinated dams, water-conveyance structures, turbines and electrical connections. Individual packages of a large plant may be awarded to different contractors. This interpretation distinguishes the disclosed company role from ownership of the entire facility or sole responsibility for all EPC works."
      },
      {
        "name": "Building and infrastructure construction",
        "description": "Large building projects separate main construction, mechanical and electrical systems and eventual operation according to contract. Structural sequencing and site logistics depend on those interfaces. This interpretation distinguishes the disclosed construction package from investment or operating responsibility for the entire development."
      }
    ],
    "turnkeyCapabilities": {
      "engineeringDesign": true,
      "procurementSupply": true,
      "constructionCivil": true,
      "commissioningTesting": true,
      "substationEpc": true,
      "highVoltageTransmission": true,
      "powerPlantEpc": true,
      "gridInterconnection": true
    },
    "keyProjects": [
      {
        "sourceUrl": "https://en.powerchina.cn/2026-10/09/c_829125.htm",
        "completionYear": 2026,
        "title": "Wayra Solar and step-up substation",
        "country": "Peru",
        "capacityOrScope": "96.9 MW solar; 220 kV substation",
        "description": "POWERCHINA reported full grid connection of Peru’s 96.9 MW Wayra Solar facility, delivered with a 220 kV step-up substation. Renewable facilities distinguish generation-equipment installation, energy collection and grid connection as separate progress stages. Protection, site testing and utility acceptance influence overall delivery. This engineering interpretation explains why the announced physical capacity must be read alongside the stated completion or operating milestone.",
        "technologies": [
          "Solar photovoltaics",
          "High-voltage substation",
          "Grid connection"
        ]
      },
      {
        "sourceUrl": "https://en.powerchina.cn/2026-09/24/c_829123.htm",
        "completionYear": 2026,
        "title": "Francisco Juana solar facilities",
        "country": "Colombia",
        "capacityOrScope": "15.99 MW total solar; EPC and acceptance",
        "description": "POWERCHINA reported acceptance of Colombia’s Francisco Juana solar project: the 15.99 MW facilities involved EPC delivery from design through grid connection. Renewable facilities distinguish generation-equipment installation, energy collection and grid connection as separate progress stages. Protection, site testing and utility acceptance influence overall delivery. This engineering interpretation explains why the announced physical capacity must be read alongside the stated completion or operating milestone.",
        "technologies": [
          "Solar photovoltaics",
          "Grid connection"
        ]
      },
      {
        "sourceUrl": "https://en.powerchina.cn/2026-09/20/c_829121.htm",
        "completionYear": 2026,
        "title": "Piauí high-voltage transmission line",
        "country": "Brazil",
        "capacityOrScope": "500 kV; 304 km line; commercial operation",
        "description": "POWERCHINA’s 500 kV transmission line in Piauí, Brazil, entered commercial operation; the announced line length is 304 km. For transmission delivery, the important interface is how the line and substation operate together. Protection coordination, power transformers, site testing and utility acceptance require separate execution packages. This engineering interpretation explains why the disclosed grid scope matters.",
        "technologies": [
          "Power transmission line",
          "Grid connection"
        ]
      }
    ],
    "certifications": [],
    "highlightStats": [
      {
        "label": "Foundation / company heritage",
        "value": "2011"
      },
      {
        "label": "Sourced example project scope",
        "value": "96.9 MW"
      },
      {
        "label": "Sourced example transmission voltage",
        "value": "500 kV"
      }
    ],
    "contactInfo": {
      "address": "Building 1, Courtyard 1, Linglongxiang Road, Haidian District, Beijing 100037, China",
      "website": "https://en.powerchina.cn",
      "inquiryUrl": "https://en.powerchina.cn/contactus.html"
    },
    "sources": [
      {
        "name": "Corporate overview",
        "url": "https://en.powerchina.cn/history.html"
      },
      {
        "name": "Leadership",
        "url": "https://en.powerchina.cn/leadership.html"
      },
      {
        "name": "POWERCHINA signed with Sencia for Bogotá’s El Campín stadium: the 50000-seat Colombian scope includes design, supply, construction, commissioning and handover.",
        "url": "https://en.powerchina.cn/2026-10/10/c_829126.htm"
      },
      {
        "name": "POWERCHINA reported full grid connection of Peru’s 96.9 MW Wayra Solar facility, delivered with a 220 kV step-up substation.",
        "url": "https://en.powerchina.cn/2026-10/09/c_829125.htm"
      },
      {
        "name": "POWERCHINA reported acceptance of Colombia’s Francisco Juana solar project: the 15.99 MW facilities involved EPC delivery from design through grid connection.",
        "url": "https://en.powerchina.cn/2026-09/24/c_829123.htm"
      },
      {
        "name": "POWERCHINA and Sichuan Energy Investment Development broke ground on Georgia’s 104 MW Imereti wind project, whose design provides for 13 turbines.",
        "url": "https://en.powerchina.cn/2026-09/22/c_829122.htm"
      },
      {
        "name": "Mongolia’s president inspected POWERCHINA’s ongoing 90 MW Erdeneburen hydropower project, visiting dam tunnels and powerhouse construction areas.",
        "url": "https://en.powerchina.cn/2026-09/21/c_829120.htm"
      },
      {
        "name": "POWERCHINA’s 500 kV transmission line in Piauí, Brazil, entered commercial operation; the announced line length is 304 km.",
        "url": "https://en.powerchina.cn/2026-09/20/c_829121.htm"
      },
      {
        "name": "POWERCHINA reported energization of Skun’s main transformer within Cambodia’s national-grid 230 kV substation project group, followed by continuous trial operation.",
        "url": "https://en.powerchina.cn/2026-08/21/c_829113.htm"
      }
    ]
  },
  "leadership": {
    "name": "Wang Xiaojun",
    "role": {
      "tr": "Yönetim Kurulu Başkan Yardımcısı ve Genel Müdür",
      "en": "Vice Chairman of the Board and General Manager",
      "de": "Stellvertretender Vorstandsvorsitzender und General Manager",
      "ru": "Заместитель председателя совета и генеральный директор",
      "es": "Vicepresidente del consejo y director general",
      "ar": "نائب رئيس مجلس الإدارة والمدير العام",
      "it": "Vicepresidente del consiglio e direttore generale",
      "pt": "Vice-presidente do conselho e diretor-geral"
    },
    "biography": {
      "tr": "Wang Xiaojun, POWERCHINA’nın resmi liderlik sayfasında yönetim kurulu başkan yardımcısı ve genel müdür olarak listelenir. Bu kayıt, şirketin kullandığı genel müdür unvanını korur. Yönetim kurulu başkanlığı ayrı bir görevdir. İsim ve görev, enerji ve altyapı grubunun güncel kurumsal liderlik listesine dayanır.",
      "en": "Wang Xiaojun is listed on POWERCHINA’s official leadership page as vice chairman of the board and general manager. This record preserves the company’s general-manager title. Chairman of the board is a separate position. The name and role follow the energy and infrastructure group’s current corporate leadership listing.",
      "de": "Wang Xiaojun wird auf POWERCHINAs offizieller Führungsseite als stellvertretender Vorstandsvorsitzender und General Manager geführt. Dieser Eintrag bewahrt den verwendeten Titel. Der Vorstandsvorsitz ist eine separate Position. Name und Funktion folgen der aktuellen Führungsübersicht des Energie- und Infrastrukturkonzerns.",
      "ru": "Ван Сяоцзюнь указан на официальной странице POWERCHINA заместителем председателя совета и генеральным директором. Запись сохраняет используемое компанией название должности. Председатель совета — отдельная позиция. Имя и роль следуют действующему корпоративному списку энергетической и инфраструктурной группы.",
      "es": "Wang Xiaojun figura en la página oficial de POWERCHINA como vicepresidente del consejo y director general. Esta ficha conserva el título utilizado por la empresa. La presidencia del consejo es un cargo distinto. Nombre y función siguen el listado directivo actual del grupo energético e infraestructural.",
      "ar": "تدرج صفحة POWERCHINA الرسمية وانغ شياو جون نائبا لرئيس مجلس الإدارة ومديرا عاما. يحافظ السجل على لقب المدير العام الذي تستخدمه الشركة. ورئاسة مجلس الإدارة منصب منفصل. يستند الاسم والدور إلى قائمة القيادة المؤسسية الحالية لمجموعة الطاقة والبنية التحتية.",
      "it": "Wang Xiaojun compare nella pagina ufficiale POWERCHINA come vicepresidente del consiglio e direttore generale. Questa scheda conserva il titolo aziendale. La presidenza del consiglio è una posizione distinta. Nome e ruolo seguono l’elenco dirigenziale attuale del gruppo energetico e infrastrutturale.",
      "pt": "Wang Xiaojun consta na página oficial POWERCHINA como vice-presidente do conselho e diretor-geral. Esta ficha preserva o título utilizado pela empresa. A presidência do conselho é posição distinta. Nome e função seguem a lista atual da liderança do grupo energético e de infraestrutura."
    },
    "sources": [
      {
        "name": "POWERCHINA",
        "url": "https://en.powerchina.cn/leadership.html"
      }
    ],
    "verifiedOn": "2026-10-10"
  },
  "news": [
    {
      "title": "POWERCHINA signs Bogotá El Campín stadium contract",
      "url": "https://voltformer.com/news/powerchina-bogota-el-campin-stadium-contract-2026"
    },
    {
      "title": "POWERCHINA reports full grid connection at Peru’s Wayra Solar project",
      "url": "https://voltformer.com/news/powerchina-wayra-solar-peru-grid-connection-2026"
    },
    {
      "title": "POWERCHINA reports acceptance of Francisco Juana solar facilities in Colombia",
      "url": "https://voltformer.com/news/powerchina-francisco-juana-colombia-acceptance-2026"
    },
    {
      "title": "POWERCHINA and Sichuan Energy break ground on Georgia’s Imereti wind project",
      "url": "https://voltformer.com/news/powerchina-imereti-wind-georgia-groundbreaking-2026"
    },
    {
      "title": "POWERCHINA’s Erdeneburen hydropower works receive Mongolian presidential visit",
      "url": "https://voltformer.com/news/powerchina-erdeneburen-mongolia-construction-inspection-2026"
    },
    {
      "title": "POWERCHINA’s Piauí transmission line enters commercial operation",
      "url": "https://voltformer.com/news/powerchina-piaui-brazil-500-kv-energization-2026"
    },
    {
      "title": "POWERCHINA reports Skun main-transformer energization in Cambodia",
      "url": "https://voltformer.com/news/powerchina-skun-cambodia-transformer-energization-2026"
    }
  ]
}