{
  "language": "en",
  "url": "https://voltformer.com/epc-contractors/china-energy-engineering",
  "company": {
    "id": "china-energy-engineering",
    "slug": "china-energy-engineering",
    "name": "China Energy Engineering",
    "legalName": "China Energy Engineering Corporation Limited",
    "country": "China",
    "countryCode": "CN",
    "headquarters": "Beijing, China",
    "foundedYear": 2014,
    "website": "https://en.ceec.net.cn",
    "logo": "/logos/china-energy-engineering.svg",
    "tagline": "Renewable energy EPC · Energy storage and grid integration · Hydropower engineering and construction",
    "overview": "China Energy Engineering Corporation Limited is a listed engineering and construction company incorporated in 2014 and based in Beijing. The parent group and listed company are distinct legal entities. Its international portfolio spans solar, wind, storage, hydropower and grids through design institutes and construction subsidiaries. References preserve the stated roles of Shanxi, Gezhouba and Jiangsu businesses. A package’s host-plant capacity does not mean the contractor delivered the entire plant alone.",
    "specialization": [
      "Renewable energy EPC",
      "Energy storage and grid integration",
      "Hydropower engineering and construction",
      "Transmission and substation EPC"
    ],
    "sectors": [
      "power-generation",
      "renewable-energy",
      "substations-transmission",
      "industrial-plants",
      "energy-storage-bess"
    ],
    "services": [
      {
        "name": "Renewable energy EPC",
        "description": "Renewable facilities distinguish generation-equipment installation, energy collection and grid connection as separate progress stages. Protection, site testing and utility acceptance influence overall delivery. This engineering interpretation explains why the announced physical capacity must be read alongside the stated completion or operating milestone."
      },
      {
        "name": "Energy storage and grid integration",
        "description": "Storage projects use MW for power and MWh for energy capacity. Batteries, power conversion, control systems and the substation create different technical interfaces. This interpretation preserves the disclosed ratings while distinguishing balance-of-plant responsibility from the supply of the complete battery technology."
      },
      {
        "name": "Hydropower engineering and construction",
        "description": "Hydropower requires coordinated dams, water-conveyance structures, turbines and electrical connections. Individual packages of a large plant may be awarded to different contractors. This interpretation distinguishes the disclosed company role from ownership of the entire facility or sole responsibility for all EPC works."
      },
      {
        "name": "Transmission and substation EPC",
        "description": "For transmission delivery, the important interface is how the line and substation operate together. Protection coordination, power transformers, site testing and utility acceptance require separate execution packages. This engineering interpretation explains why the disclosed grid scope matters."
      }
    ],
    "turnkeyCapabilities": {
      "engineeringDesign": true,
      "procurementSupply": true,
      "constructionCivil": true,
      "commissioningTesting": true,
      "substationEpc": true,
      "highVoltageTransmission": true,
      "powerPlantEpc": true,
      "gridInterconnection": true
    },
    "keyProjects": [
      {
        "sourceUrl": "https://en.ceec.net.cn/art/2026/10/10/art_138_2511379.html",
        "client": "AEJ Nozu Storage Power Plant Contract Company",
        "title": "AEJ Nozu battery balance of plant",
        "country": "Japan",
        "capacityOrScope": "50 MW/196 MWh; balance-of-plant EPC",
        "description": "CEEC subsidiary Shanxi Electric Power Engineering won balance-of-plant EPC for the 50 MW/196 MWh AEJ Nozu battery facility in Oita, Japan. Storage projects use MW for power and MWh for energy capacity. Batteries, power conversion, control systems and the substation create different technical interfaces. This interpretation preserves the disclosed ratings while distinguishing balance-of-plant responsibility from the supply of the complete battery technology.",
        "technologies": [
          "Battery energy storage",
          "Grid connection"
        ],
        "completionYear": "Contract announced 2026; completion undisclosed"
      },
      {
        "sourceUrl": "https://en.ceec.net.cn/art/2026/9/30/art_138_2511372.html",
        "client": "PLN",
        "title": "Upper Cisokan Lot 4 hydraulic metal works",
        "country": "Indonesia",
        "capacityOrScope": "Lot 4 metal structures; entire plant 1040 MW",
        "description": "CEEC’s Gezhouba began Upper Cisokan Lot 4 hydraulic metal-structure works in Indonesia; PLN’s complete pumped-storage plant has 1040 MW capacity. Hydropower requires coordinated dams, water-conveyance structures, turbines and electrical connections. Individual packages of a large plant may be awarded to different contractors. This interpretation distinguishes the disclosed company role from ownership of the entire facility or sole responsibility for all EPC works.",
        "technologies": [
          "Hydroelectric generation",
          "Civil and structural engineering"
        ],
        "completionYear": "Construction started 2026; completion undisclosed"
      },
      {
        "sourceUrl": "https://en.ceec.net.cn/art/2026/4/21/art_138_2511290.html",
        "completionYear": 2025,
        "title": "Batang Ai floating solar facility",
        "country": "Malaysia",
        "capacityOrScope": "50 MW; Jiangsu design institute EPC",
        "description": "CEEC reported a ministerial visit to Malaysia’s 50 MW Batang Ai floating solar facility, delivered by Jiangsu Power Design Institute and grid-connected in 2025. Renewable facilities distinguish generation-equipment installation, energy collection and grid connection as separate progress stages. Protection, site testing and utility acceptance influence overall delivery. This engineering interpretation explains why the announced physical capacity must be read alongside the stated completion or operating milestone.",
        "technologies": [
          "Solar photovoltaics",
          "Grid connection"
        ]
      }
    ],
    "certifications": [],
    "highlightStats": [
      {
        "label": "Foundation / company heritage",
        "value": "2014"
      },
      {
        "label": "Sourced example project scope",
        "value": "50 MW/196 MWh"
      },
      {
        "label": "Sourced example transmission voltage",
        "value": "500 kV"
      }
    ],
    "contactInfo": {
      "address": "Building 1, No. 26 Xidawang Road, Chaoyang District, Beijing, China",
      "website": "https://en.ceec.net.cn",
      "inquiryUrl": "https://en.ceec.net.cn/col/col58598/index.html",
      "phone": "+86 10 59098831"
    },
    "sources": [
      {
        "name": "Corporate overview",
        "url": "https://en.ceec.net.cn"
      },
      {
        "name": "Leadership",
        "url": "https://en.ceec.net.cn/col/col58596/index.html"
      },
      {
        "name": "CEEC subsidiary Shanxi Electric Power Engineering won balance-of-plant EPC for the 50 MW/196 MWh AEJ Nozu battery facility in Oita, Japan.",
        "url": "https://en.ceec.net.cn/art/2026/10/10/art_138_2511379.html"
      },
      {
        "name": "CEEC’s GEDI subsidiary reported installation of all turbines at the 25 MW Tan Thuan III intertidal wind project in Ca Mau, Vietnam.",
        "url": "https://en.ceec.net.cn/art/2026/10/9/art_138_2511381.html"
      },
      {
        "name": "CEEC’s Gezhouba began Upper Cisokan Lot 4 hydraulic metal-structure works in Indonesia; PLN’s complete pumped-storage plant has 1040 MW capacity.",
        "url": "https://en.ceec.net.cn/art/2026/9/30/art_138_2511372.html"
      },
      {
        "name": "A CEEC consortium signed the Midelt I EPC contract in Morocco; the announced design combines approximately 630 MW solar with 1300 MWh battery storage.",
        "url": "https://en.ceec.net.cn/art/2026/9/14/art_138_2511366.html"
      },
      {
        "name": "CEEC reported a ministerial visit to Malaysia’s 50 MW Batang Ai floating solar facility, delivered by Jiangsu Power Design Institute and grid-connected in 2025.",
        "url": "https://en.ceec.net.cn/art/2026/4/21/art_138_2511290.html"
      },
      {
        "name": "A CEEC consortium installed core battery equipment at Egypt’s Abydos II, whose full scope includes 1000 MW solar, 600 MWh storage and a 500 kV substation.",
        "url": "https://en.ceec.net.cn/art/2026/3/23/art_138_2511270.html"
      },
      {
        "name": "CEEC subsidiary Shanxi Electric Power Engineering won EPC for Singapore’s 91 MW Pandan Reservoir floating solar project, including a 66 kV grid connection.",
        "url": "https://en.ceec.net.cn/art/2026/1/28/art_138_2511188.html"
      },
      {
        "name": "Listed-company incorporation and articles",
        "url": "https://www.hkexnews.hk/listedco/listconews/sehk/2025/1223/2025122301610.pdf"
      },
      {
        "name": "2025 annual report and governance",
        "url": "https://www.hkexnews.hk/listedco/listconews/sehk/2026/0327/2026032704590.pdf"
      },
      {
        "name": "Official contact information",
        "url": "https://en.ceec.net.cn/col/col58598/index.html"
      }
    ]
  },
  "leadership": {
    "name": "Ni Zhen",
    "role": {
      "tr": "Borsaya kote şirketin Yönetim Kurulu Başkanı",
      "en": "Chairman of the listed company",
      "de": "Vorsitzender der börsennotierten Gesellschaft",
      "ru": "Председатель листинговой компании",
      "es": "Presidente de la sociedad cotizada",
      "ar": "رئيس مجلس إدارة الشركة المدرجة",
      "it": "Presidente della società quotata",
      "pt": "Presidente da sociedade listada"
    },
    "biography": {
      "tr": "Ni Zhen, China Energy Engineering Corporation Limited’in resmi yönetim kurulu sayfasında başkan olarak listelenir. Kayıt borsaya kote şirketin görevini esas alır. Ana grubun yönetim görevleri farklı bir tüzel kişilik bağlamına aittir. Resmi yıllık rapor ve mevcut yönetim listesi, önceki yönetici isimleriyle karışmayı önleyen kaynaklardır.",
      "en": "Ni Zhen is listed as chairman on China Energy Engineering Corporation Limited’s official board page. This record uses the position at the listed company. Parent-group management roles belong to a different legal-entity context. The official annual report and current board listing provide the basis for distinguishing him from previous executives.",
      "de": "Ni Zhen wird auf der offiziellen Vorstandsseite von China Energy Engineering Corporation Limited als Vorsitzender geführt. Der Eintrag bezieht sich auf die börsennotierte Gesellschaft. Führungsrollen der Muttergruppe gehören zu einem anderen Rechtsträger. Jahresbericht und aktuelle Vorstandsliste unterscheiden ihn von früheren Führungskräften.",
      "ru": "Ни Чжэнь указан председателем на официальной странице совета China Energy Engineering Corporation Limited. Запись относится к листинговой компании. Должности материнской группы принадлежат другому юридическому контексту. Официальный годовой отчёт и действующий список совета позволяют отличить его от прежних руководителей.",
      "es": "Ni Zhen figura como presidente en la página oficial del consejo de China Energy Engineering Corporation Limited. Esta ficha utiliza el cargo de la sociedad cotizada. Los cargos del grupo matriz pertenecen a otra entidad. El informe anual y el consejo actual lo distinguen de directivos anteriores.",
      "ar": "تدرج صفحة مجلس China Energy Engineering Corporation Limited الرسمية ني تشن رئيسا. يعتمد السجل منصبه في الشركة المدرجة. وتنتمي أدوار إدارة المجموعة الأم إلى سياق قانوني مختلف. يوفر التقرير السنوي الرسمي وقائمة المجلس الحالية أساس التمييز بينه وبين المديرين السابقين.",
      "it": "Ni Zhen compare come presidente nella pagina ufficiale del consiglio di China Energy Engineering Corporation Limited. Questa scheda usa il ruolo nella società quotata. Le funzioni del gruppo madre appartengono a un’altra entità. Relazione annuale e consiglio attuale lo distinguono dai precedenti dirigenti.",
      "pt": "Ni Zhen consta como presidente na página oficial do conselho da China Energy Engineering Corporation Limited. Esta ficha usa o cargo na sociedade listada. As funções do grupo matriz pertencem a outra entidade. O relatório anual e o conselho atual o distinguem de dirigentes anteriores."
    },
    "sources": [
      {
        "name": "China Energy Engineering",
        "url": "https://en.ceec.net.cn/col/col58596/index.html"
      },
      {
        "name": "2025 annual report",
        "url": "https://www.hkexnews.hk/listedco/listconews/sehk/2026/0327/2026032704590.pdf"
      }
    ],
    "verifiedOn": "2026-10-10"
  },
  "news": [
    {
      "title": "CEEC subsidiary wins Nozu battery balance-of-plant EPC in Japan",
      "url": "https://voltformer.com/news/ceec-nozu-japan-battery-bop-epc-2026"
    },
    {
      "title": "CEEC subsidiary completes turbine installation at Tan Thuan III in Vietnam",
      "url": "https://voltformer.com/news/ceec-tan-thuan-three-wind-turbines-vietnam-2026"
    },
    {
      "title": "CEEC’s Gezhouba starts hydraulic metal works at Upper Cisokan",
      "url": "https://voltformer.com/news/ceec-upper-cisokan-lot-four-indonesia-2026"
    },
    {
      "title": "CEEC consortium signs Midelt I solar-and-storage EPC contract in Morocco",
      "url": "https://voltformer.com/news/ceec-midelt-one-morocco-solar-storage-epc-2026"
    },
    {
      "title": "CEEC reports ministerial visit to Batang Ai floating solar in Malaysia",
      "url": "https://voltformer.com/news/ceec-batang-ai-malaysia-floating-solar-visit-2026"
    },
    {
      "title": "CEEC consortium installs core battery equipment at Egypt’s Abydos II",
      "url": "https://voltformer.com/news/ceec-abydos-two-egypt-storage-installation-2026"
    },
    {
      "title": "CEEC subsidiary wins Pandan Reservoir floating-solar EPC in Singapore",
      "url": "https://voltformer.com/news/ceec-pandan-reservoir-singapore-floating-solar-epc-2026"
    }
  ]
}
