{
  "language": "en",
  "url": "https://voltformer.com/epc-contractors/aker-solutions",
  "company": {
    "id": "aker-solutions",
    "slug": "aker-solutions",
    "name": "Aker Solutions",
    "legalName": "Aker Solutions ASA",
    "country": "Norway",
    "headquarters": "Fornebu, Norway",
    "tagline": "Engineering, project execution and lifecycle services for energy",
    "overview": "Aker Solutions ASA is a Norwegian engineering and project-execution company headquartered at Fornebu. It serves oil and gas and energy-transition markets through studies, engineering, equipment, project delivery and lifecycle services. Scope differs by business unit and contract: Tussa II is an electromechanical-equipment supply package, and subsea activity is partly held with SLB through the OneSubsea joint venture.",
    "specialization": [
      "Concept, FEED and detailed engineering",
      "Energy project execution and equipment",
      "Maintenance, modifications and integrity",
      "Subsea production systems and services"
    ],
    "services": [
      {
        "name": "Energy-project engineering and execution",
        "description": "Supports projects from concept and front-end engineering through equipment supply, construction, installation or commissioning where included in the contract."
      },
      {
        "name": "Lifecycle and integrity services",
        "description": "Maintenance, modifications, operational support and integrity management for operating energy assets."
      },
      {
        "name": "Life-cycle maintenance and modifications",
        "description": "Engineering and maintenance services for operating offshore and onshore energy assets under awarded frame agreements."
      },
      {
        "name": "Front-end engineering and design",
        "description": "Study and FEED services that mature project definition before an execution or investment decision."
      }
    ],
    "keyProjects": [
      {
        "title": "Tussa II hydropower plant equipment package",
        "client": "Tussa Energi",
        "country": "Norway",
        "capacityOrScope": "Supply of electromechanical components, including two 75 MW Pelton units, generators, control systems, high-voltage equipment and transformers; planned delivery in 2030.",
        "description": "Aker Solutions is supplying the plant’s electromechanical package. Norconsult and Aurstad Tunnel are also named among the project development partners; the civil works scope is not attributed wholly to Aker Solutions.",
        "technologies": [
          "Pelton turbines",
          "High-voltage equipment and transformers"
        ],
        "sourceUrl": "https://www.akersolutions.com/news/news-archive/2026/aker-solutions-secures-contract-with-tussa-energi-for-tussa-ii-hydropower-plant/"
      },
      {
        "title": "Troll Phase 3 Stage II topside modification",
        "client": "Equinor",
        "country": "Norway",
        "capacityOrScope": "Awarded 30 September 2024: EPCIC topside modifications to prepare Troll A to receive and process gas from eight new wells at Troll West, plus equipment for initial well-fluid clean-up; scheduled for completion at the end of 2027.",
        "description": "The defined package is Troll Phase 3 Stage II, not a general compression or power-from-shore project. Aker Solutions has lead responsibility for interfaces between project contractors; OneSubsea, in which Aker Solutions owns 20%, was separately contracted for the subsea production system.",
        "technologies": [
          "Topside modification and EPCIC",
          "Gas processing and well-fluid clean-up systems"
        ],
        "sourceUrl": "https://www.akersolutions.com/news/news-archive/2024/aker-solutions-asa-aker-solutions-secures-troll-phase-3-stage-ii-topside-modification-contract/"
      },
      {
        "title": "Northern Lights Phase 2 onshore facilities EPC",
        "client": "Northern Lights JV",
        "country": "Norway",
        "capacityOrScope": "Engineering, procurement and construction of Phase 2 onshore facilities for the Northern Lights JV; project work was expected to start in Q2 2025 and complete in 2028. Phase 2 raises system transport and storage capacity to at least 5 million tonnes of CO₂ per year; Aker’s cited award is for onshore facilities, not the offshore transport system.",
        "description": "The April 2025 award was from Equinor acting as technical service provider for the Northern Lights joint venture. It covers EPC of the onshore facilities at Øygarden, with work involving Fornebu, Stord and Mumbai. The 5 million tonnes per year figure describes the wider Northern Lights system.",
        "technologies": [
          "Onshore CO₂ receiving and storage facilities",
          "Process systems and EPC execution"
        ],
        "sourceUrl": "https://www.akersolutions.com/news/news-archive/2025/aker-solutions-asa-aker-solutions-awarded-contract-for-second-phase-of-the-northern-lights-carbon-storage-project/"
      }
    ],
    "highlightStats": [
      {
        "label": "Head office",
        "value": "Fornebu, Norway"
      },
      {
        "label": "Listed",
        "value": "Oslo Stock Exchange: AKSO"
      },
      {
        "label": "Stock ticker",
        "value": "Oslo Stock Exchange: AKSO"
      }
    ],
    "foundedYear": 2014,
    "countryCode": "NO",
    "website": "https://www.akersolutions.com/",
    "logo": "/logos/aker-solutions.svg",
    "sectors": [
      "oil-gas-energy",
      "renewable-energy",
      "industrial-plants",
      "substations-transmission"
    ],
    "turnkeyCapabilities": {
      "engineeringDesign": true,
      "procurementSupply": true,
      "constructionCivil": true,
      "commissioningTesting": true,
      "substationEpc": false,
      "highVoltageTransmission": false,
      "powerPlantEpc": false,
      "gridInterconnection": false
    },
    "certifications": [],
    "contactInfo": {
      "address": "Fornebu, Norway",
      "website": "https://www.akersolutions.com/",
      "inquiryUrl": "https://www.akersolutions.com/contact/"
    },
    "sources": [
      {
        "name": "Aker Solutions · 2025 annual report / Fornebu head office",
        "url": "https://www.akersolutions.com/globalassets/investors/agm/2026/aker-solutions-annual-report-2025.pdf"
      },
      {
        "name": "Aker Solutions · 2014 demerger history",
        "url": "https://www.akersolutions.com/globalassets/huginreport/2014/annual-report-2014.pdf"
      },
      {
        "name": "Aker Solutions · Current management; Paal Eikeseth from September 2026",
        "url": "https://www.akersolutions.com/who-we-are/management/"
      },
      {
        "name": "Aker Solutions · CEO appointment, effective 2026-09-01",
        "url": "https://www.akersolutions.com/news/news-archive/2026/aker-solutions-asa-paal-eikeseth-appointed-new-ceo-of-aker-solutions/"
      },
      {
        "name": "Aker Solutions · company overview",
        "url": "https://www.akersolutions.com/who-we-are/"
      },
      {
        "name": "Aker Solutions · Tussa II hydropower plant equipment package",
        "url": "https://www.akersolutions.com/news/news-archive/2026/aker-solutions-secures-contract-with-tussa-energi-for-tussa-ii-hydropower-plant/"
      },
      {
        "name": "Aker Solutions · Troll Phase 3 Stage II topside modification",
        "url": "https://www.akersolutions.com/news/news-archive/2024/aker-solutions-asa-aker-solutions-secures-troll-phase-3-stage-ii-topside-modification-contract/"
      },
      {
        "name": "Aker Solutions · Northern Lights Phase 2 onshore facilities EPC",
        "url": "https://www.akersolutions.com/news/news-archive/2025/aker-solutions-asa-aker-solutions-awarded-contract-for-second-phase-of-the-northern-lights-carbon-storage-project/"
      }
    ]
  },
  "leadership": {
    "name": "Paal Eikeseth",
    "role": {
      "en": "President and CEO",
      "tr": "Başkan ve CEO",
      "de": "Präsident und CEO",
      "ru": "Президент и генеральный директор",
      "es": "Presidente y CEO",
      "ar": "الرئيس والمدير التنفيذي",
      "it": "Presidente e CEO",
      "pt": "Presidente e CEO"
    },
    "since": "2026-09-01",
    "biography": {
      "en": "President and CEO of Aker Solutions since 1 September 2026. He previously led the Life Cycle business and electrification, maintenance and modification activities. He holds a business degree from the Norwegian School of Economics.",
      "tr": "Aker Solutions’ta 1 Eylül 2026’dan beri Başkan ve CEO’dur. Daha önce Life Cycle iş kolunu ve elektrifikasyon, bakım ve modifikasyon faaliyetlerini yönetti. Norveç Ekonomi Okulu’ndan işletme diploması vardır.",
      "de": "Präsident und CEO von Aker Solutions seit dem 1. September 2026. Zuvor leitete er das Life-Cycle-Geschäft sowie Bereiche für Elektrifizierung, Wartung und Modifikationen. Er hat einen Abschluss der Norwegian School of Economics.",
      "ru": "Президент и генеральный директор Aker Solutions с 1 сентября 2026 года. Ранее руководил бизнесом Life Cycle, электрификацией, обслуживанием и модернизацией. Имеет экономическое образование Норвежской школы экономики.",
      "es": "Presidente y CEO de Aker Solutions desde el 1 de septiembre de 2026. Antes dirigió Life Cycle y las actividades de electrificación, mantenimiento y modificaciones. Tiene un título de la Escuela Noruega de Economía.",
      "ar": "الرئيس والمدير التنفيذي لـAker Solutions منذ 1 سبتمبر 2026. قاد سابقًا أعمال Life Cycle وأنشطة الكهرباء والصيانة والتعديل. يحمل شهادة في الاقتصاد من مدرسة النرويج للاقتصاد.",
      "it": "Presidente e CEO di Aker Solutions dal 1º settembre 2026. In precedenza ha guidato Life Cycle e le attività di elettrificazione, manutenzione e modifica. Ha una laurea della Norwegian School of Economics.",
      "pt": "Presidente e CEO da Aker Solutions desde 1º de setembro de 2026. Antes liderou Life Cycle e atividades de eletrificação, manutenção e modificações. Tem formação pela Norwegian School of Economics."
    },
    "sources": [
      {
        "name": "Aker Solutions · Current management",
        "url": "https://www.akersolutions.com/who-we-are/management/"
      },
      {
        "name": "Aker Solutions · CEO appointment, effective 2026-09-01",
        "url": "https://www.akersolutions.com/news/news-archive/2026/aker-solutions-asa-paal-eikeseth-appointed-new-ceo-of-aker-solutions/"
      }
    ],
    "verifiedOn": "2026-10-11"
  },
  "news": [
    {
      "title": "Aker Solutions wins modernization contract for Nes hydropower station",
      "url": "https://voltformer.com/news/aker-solutions-2026-10-08-aker-solutions-awarded-nes-hydropower-upgrade-by-hafslund-kraft"
    },
    {
      "title": "Aker Solutions expands engineering and integrity work for bp in the North Sea",
      "url": "https://voltformer.com/news/aker-solutions-2026-09-30-aker-solutions-awarded-engineering-and-integrity-contract-by-bp"
    },
    {
      "title": "Aker Solutions and Microsoft partner to advance CCS and carbon-removal projects",
      "url": "https://voltformer.com/news/aker-solutions-2026-08-24-aker-solutions-to-accelerate-carbon-capture-and-removal-projects-with-microsoft"
    },
    {
      "title": "Aker Solutions reports second-quarter and half-year 2026 results",
      "url": "https://voltformer.com/news/aker-solutions-2026-07-14-aker-solutions-asasecond-quarter-and-half-year-results-2026"
    },
    {
      "title": "Aker Solutions to supply electromechanical equipment for Tussa II",
      "url": "https://voltformer.com/news/aker-solutions-2026-06-29-aker-solutions-secures-contract-with-tussa-energi-for-tussa-ii-hydropower-plant"
    },
    {
      "title": "Aker Solutions wins five-year White Rose services agreement",
      "url": "https://voltformer.com/news/aker-solutions-2026-06-26-aker-solutions-awarded-engineering-and-maintenance-service-agreement-from-cenovus-energy"
    },
    {
      "title": "Aker Solutions wins FEED contract for Equinor’s Atlantis tie-in",
      "url": "https://voltformer.com/news/aker-solutions-2026-05-05-aker-solutions-wins-feed-contract-for-equinors-atlantis-tie-in"
    }
  ]
}
