# Mingyang Electrical (Mingyang Group)

> Technology giant specialized in renewable energy, wind plants and BESS battery storage transformers; Mingyang produces 66 kV floating offshore step-up transformers and integrated field solar compact kiosks.

> Headquarters: Zhongshan, Guangdong, China - Warranty: 3 years - Sample models below: 3 (total catalog models: 3)

**Canonical:** https://voltformer.com/brand/mingyang-electrical - markdown: https://voltformer.com/brand/mingyang-electrical.md

## Overview

Technology giant specialized in renewable energy, wind plants and BESS battery storage transformers; Mingyang produces 66 kV floating offshore step-up transformers and integrated field solar compact kiosks. Request a formal factory quotation through Voltformer. Verify applicable standards, guaranteed ratings and declarations of conformity against the exact offered-model documentation and project jurisdiction. The IEC/EN 50708 series and EU Regulations 548/2014 and 2019/1783 apply only where the transformer and market fall within their legal scope.

## Official sources

- https://mingyang.com.cn/

- **Last reviewed:** 2026-09-13

## Sample Models

- [VF-MY-FLT-7000-66 - Mingyang 7000 kVA 66/33 kV Floating Offshore Wind Step-Up Transformer](https://voltformer.com/product/mingyang-7000-kva-66-33-kv-floating-offshore-wind-step-up-transformer.md)
- [VF-MY-BESS-4000-35 - Mingyang 4000 kVA 35/0.69-0.69 kV Bidirectional 4-Quadrant BESS Battery Storage Transformer](https://voltformer.com/product/mingyang-4000-kva-35-0-69-0-69-kv-bidirectional-4-quadrant-bess-battery-storage-transformer.md)
- [VF-MY-KSK-3150-35 - Mingyang 3150 kVA 35 kV Prefabricated Field Solar Compact Substation (Inverter Integrated)](https://voltformer.com/product/mingyang-3150-kva-35-kv-prefabricated-field-solar-compact-substation-inverter-integrated.md)

## RFQ

Use the family-specific search/get tools in [the tool reference](https://voltformer.com/tool-reference.md) to choose an exact SKU or ID. RFQ submission requires authentication, a complete draft and explicit user confirmation; unknown project inputs must not be invented.
