# Legrand Zucchini

> Global expert in building electrical infrastructure and data center solutions; Legrand provides high energy efficiency and compact installation with GreenT.HE high-efficiency cast-resin dry-type transformers and integrated busbar systems.

> Headquarters: Limoges, France & Varese, Italy - Warranty: 3 years - Sample models below: 3 (total catalog models: 3)

**Canonical:** https://voltformer.com/brand/legrand-zucchini - markdown: https://voltformer.com/brand/legrand-zucchini.md

## Overview

Global expert in building electrical infrastructure and data center solutions; Legrand provides high energy efficiency and compact installation with GreenT.HE high-efficiency cast-resin dry-type transformers and integrated busbar systems. Request a formal factory quotation through Voltformer. Verify applicable standards, guaranteed ratings and declarations of conformity against the exact offered-model documentation and project jurisdiction. The IEC/EN 50708 series and EU Regulations 548/2014 and 2019/1783 apply only where the transformer and market fall within their legal scope.

## Official sources

- https://www.legrand.com/datacenter/au-en/brands/zucchini

- **Last reviewed:** 2026-09-13

## Sample Models

- [VF-LEG-ZUC-1600-345 - Legrand Zucchini 1600 kVA 34.5/0.4 kV Dry-Type Distribution Transformer](https://voltformer.com/product/legrand-zucchini-1600-kva-34-5-0-4-kv-dry-type-distribution-transformer.md)
- [VF-LEG-GTH-1000-345 - Legrand Zucchini GreenT.HE 1000 kVA 34.5/0.4 kV Ecodesign Tier 2 Dry-Type Transformer](https://voltformer.com/product/legrand-zucchini-greent-he-1000-kva-34-5-0-4-kv-ecodesign-tier-2-dry-type-transformer.md)
- [VF-LEG-GTH-2500-345 - Legrand Zucchini GreenT.HE 2500 kVA 34.5/0.4 kV K-13 Data Center Dry-Type Transformer](https://voltformer.com/product/legrand-zucchini-greent-he-2500-kva-34-5-0-4-kv-k-13-data-center-dry-type-transformer.md)

## RFQ

Use the family-specific search/get tools in [the tool reference](https://voltformer.com/tool-reference.md) to choose an exact SKU or ID. RFQ submission requires authentication, a complete draft and explicit user confirmation; unknown project inputs must not be invented.
