# Automatic Reclosers and Feeder Automation: IEC 62271-111 Selection

> A practical recloser guide for overhead, pad-mounted and dry-vault distribution feeders covering fault interruption, reclosing sequences, sensors, controls and SCADA.

- **Category:** Automatic Reclosers & Feeder Automation
- **Author:** Voltformer Distribution Automation Engineering
- **Publication Date:** 2026-09-12
- **Reading Time:** 8 min read
- **Key Tags:** #IEC 62271-111, #IEEE C37.60, #Automatic Recloser, #FPI, #Feeder Automation
- **Canonical URL:** https://voltformer.com/articles/automatic-reclosers-feeder-automation-iec-62271-111
- **Markdown Source:** https://voltformer.com/articles/automatic-reclosers-feeder-automation-iec-62271-111.md

### 1. Scope and Installation Type

IEC 62271-111:2019 applies to AC automatic circuit reclosers installed overhead, pad-mounted, in dry vaults or in submersible arrangements above 1 kV and up to 38 kV. The standard covers the recloser device and its relevant test and rating boundary; the feeder automation scheme remains a system-engineering responsibility.

### 2. Electrical and Mechanical Selection

| Input | Engineering question |
|---|---|
| **Network** | Maximum voltage, continuous current, fault current, X/R, grounding and phase arrangement |
| **Interruption** | Can the device interrupt the maximum available fault, including source and motor/inverter infeed? |
| **Withstand** | Are thermal short-time, peak making, insulation and environmental duties declared for the exact model? |
| **Control** | Are CT/VT or line sensors, battery, auxiliary supply, local control and communications adequate? |

The recloser’s duty must be checked against the actual feeder topology, not only the nominal line voltage. Pad-mounted and submersible installations add enclosure, water ingress, corrosion and cable-interface checks.

### 3. Reclosing and Coordination

Define the number and timing of shots, fast and delayed curves, single-phase or three-phase operation, lockout, fuse-saving or fuse-blowing philosophy, cold-load pickup and inrush behaviour. Coordinate with upstream breakers, downstream fuses, sectionalizers, distributed generation and customer protection.

Where a PV, BESS or generator source can backfeed the line, the control scheme must explicitly handle reverse power, loss of source, anti-islanding and fault contribution. A recloser setting is not transferable between a radial and an interconnected feeder.

### 4. Automation Acceptance

- Test opening, closing, lockout, manual override, local/remote authority and battery autonomy.
- Verify fault indicators, phase identification, time synchronization, event records and SCADA points.
- Prove the communication-loss fallback and the safe state after auxiliary-power loss.
- Record primary injection or equivalent functional evidence, protection curves and the final coordination study.

*Reference: IEC 62271-111:2019; IEEE Std C37.60; IEC 62271-1:2017+A1:2021.*

---

## Related Equipment & Catalog Cross-References

- [Transformers Catalog](https://voltformer.com/catalog.md): Browse medium and high voltage power transformers.
- [Medium Voltage Switchgear](https://voltformer.com/catalog.md): Air-insulated (AIS) and gas-insulated (GIS) switchgear panels.
- [Protection & Control Relays](https://voltformer.com/catalog.md): ANSI 87T differential, overcurrent and feeder protection relays.
- [Machine-Readable API Catalog](https://voltformer.com/agent-catalog.json): Autonomous agent catalog data.